My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.B.(1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
10-25-12 Packet
>
6.B.(1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:13:14 PM
Creation date
10/30/2012 1:02:15 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
^THE <br />§TROYER <br />Work Changes Proposal <br />GRO _D,a <br />based on: AIA Document G709 -2001 <br />Plaunlop . Design . Construction <br />PROJECT (Nameand address): <br />PROPOSAL REQUEST NUMBER NO: <br />001 <br />City of South Bend <br />OWNER <br />❑x <br />Memorial Hospital <br />ARCHITECT <br />❑ <br />Facades Project <br />CONSULTANT <br />❑ <br />City Project No. 112 -418 <br />CONTRACTOR <br />South Bend, IN 46601 <br />FIELD <br />O <br />OTHER <br />❑ <br />OWNER (Name and address): <br />DATE OF ISSUANCE: September 27, <br />^_012 <br />City of South Bend <br />Community & Economic <br />CONTRACT FOR: General Construction <br />Development <br />227 W. Jefferson Blvd, Ste. <br />1200S <br />South Bend, IN 46601 <br />FROM ARCHITECT (Name and CONTRACT DATE: November 11, 2411 <br />address): <br />The TToyer Group, Inc <br />550 Union St. <br />Mishawaka, IN 46544 <br />TO CONTRACTOR (Name and ARCHITECT'S PROJECT NUMBER: <br />address): 11136.00 <br />Holladay Construction Group <br />227 South Main St. <br />Suite 200 <br />South Bend, W 46601 <br />Please submit an itemized proposal for changes in the Contract Sum and Contract Time <br />for proposed modifications to the Contract Documents described herein. Within seven <br />(7) days, the Contractor must submit this proposal or notify the Architect, in writing, of <br />the date on which proposal submission is anticipated. <br />THIS WORK IS NOT A CHANGE ORDER, A CONSTRUCTION CHANGE <br />DIRECTIVE OR A DIRECTION TO PROCEED WITH WORK DESCRIBED, <br />UNLESS NOTED OTHERWISE: <br />DESCRIPTION: <br />Architectural and Coordinated Work <br />1. Fumish and install all materials, labor, etc. to revise the project to eliminate <br />the two (2) decorative columns and supporting elements and revise the work <br />as shown in the attached plans, sections and details <br />
The URL can be used to link to this page
Your browser does not support the video tag.