Laserfiche WebLink
CLIENT: 305 W. Jefferson Blvd. PROJECT: South Bend, IN 46601SHEET 3 of 8No.Total Total Shts. Senior PM Survey Manager Project Surveyor Crew Chief Survey Tech CAD Tech Hours CostResearch Records for Plats & Deeds 11 2Obtain Existing Utility Information1 22 5Establish Existing R/W's1 1 12229Alignment and Centerline Contol1225Obtain Topographic Data1114411Establish Vertical Control Benchmarks1225Locate Existing Manholes, Inlets and Water Valves112Obtain Invert Elevations, Pipe Sizes and Directions112Locate existing Utilities in the R/W's112Drafting (Utilities, Property Owners, Existing R/W)1146Total Hours2481313949Cost per Hour$160.00 $120.00 $120.00 $75.00 $65.00 $85.00Total Cost by Classification$320.00 $480.00 $960.00 $975.00 $845.00 $765.00Survey Total$4,345.00Budget$4,400.00APPENDIX "A-1"Phase 2ii - Howard Street and SR 23 IntersectionSurveyStaffhour JustifcationAbonmarche Consultants, Inc.City of South BendHoward Street Conceptual DesignOctober 27, 2020DESCRIPTIONSTAFFHOURS BY CLASSIFICATION