My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to Owner-Engineer Agreement - Traffic Analysis and Design Services for Eddy St. & Howard St. Inter – Abonmarche Consultants
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment to Owner-Engineer Agreement - Traffic Analysis and Design Services for Eddy St. & Howard St. Inter – Abonmarche Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:42:31 AM
Creation date
11/24/2020 7:12:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Abonmarche Consultants, Inc. <br />305 W. Jefferson Blvd. <br />South Bend, IN 46601 <br />APPENDIX "A-1" <br />Phase 2i - Howard Street and Eddy Street intersection <br />Design <br />Staffhour Justifcation <br />CLIENT: City of South Bend <br />PROJECT: Howard Street Conceptual Design <br />SHEET 2 of 8 <br />October 27, 2020 <br />DESCRIPTION <br />No. <br />Shts. <br />STAFFHOURS BY CLASSIFICATION <br />Total <br />Hours <br />Total <br />Cost <br />Principal <br />PM -PE <br />Pro'. En r-PE <br />Staff En r <br />CAD Tech <br />Land. Arch. <br />Setup Base Drawing <br />2 <br />2 <br />Cover Sheet <br />1 <br />1 <br />2 <br />Preliminary Geometric Layout <br />1 <br />1 <br />2 <br />2 <br />6 <br />Preliminary Intersection Details <br />2 <br />2 <br />4 <br />Preliminary Curb Ramp Details <br />1 <br />2 <br />2 <br />5 <br />Preliminary Grading Details <br />1 <br />4 <br />4 <br />9 <br />Storm Sewer Design <br />2 <br />4 <br />6 <br />Preliminary Maintenance of Traffic <br />1 <br />2 <br />4 <br />7 <br />Preliminary Quality Control <br />1 <br />1 <br />1 <br />3 <br />50% Cost Estimate <br />1 <br />2 <br />4 <br />7 <br />50% Design Review Meeting with City <br />1 <br />1 <br />2 <br />Field Check <br />1 <br />1 <br />2 <br />Utility Coordination <br />1 <br />1 <br />Final Geometric Layout <br />1 <br />1 <br />2 <br />Final Intersection Details <br />1 <br />1 <br />2 <br />Final Curb Ram Details <br />1 <br />2 <br />3 <br />Final Grading Details <br />1 <br />2 <br />3 <br />Final Maintenance of Traffic <br />1 <br />1 <br />2 <br />4 <br />Bid Documents and Special Provisions <br />1 <br />4 <br />6 <br />11 <br />Quality Control <br />1 <br />1 <br />2 <br />4 <br />Final Cost Estimate <br />1 <br />2 <br />4 <br />7 <br />Final Design Review Meeting with City <br />1 <br />1 <br />2 <br />Bid Process <br />1 <br />1 <br />1 <br />1 <br />4 <br />Total Hours <br />3 <br />10 <br />27 <br />41 <br />17 <br />0 <br />98 <br />Cost per Hour <br />$215.00 <br />$160.00 <br />$130.00 <br />$100.00 <br />$80.00 <br />$110.00 <br />Total Cost by Classification <br />$645.00 <br />$1,600.00 <br />$3,510.00 <br />$4,100.00 <br />$1,360.00 <br />$0.00 <br />Design Total <br />$11,215.00 <br />Budget <br />$11,300.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.