Laserfiche WebLink
CLIENT: 305 W. Jefferson Blvd. PROJECT: South Bend, IN 46601SHEET 4 of 8No.Total Total Shts. Principal PM - PE Proj. Engr-PE Staff Engr CAD Tech Land. Arch. Hours CostSetup Base Drawing 2 2Cover Sheet1 1 2Preliminary Geometric Layout1 1 2 1 5Preliminary Intersection Details2 1 3Preliminary Curb Ramp Details2 2 4Preliminary Grading Details1 2 2 5Storm Sewer Design1 45Preliminary Traffic Signal2 4Preliminary Maintenance of Traffic1 2 4 7Preliminary Quality Control1 1250% Cost Estimate1 4550% Design Review Meeting with City1 12Field Check1 12Utility Coordination22Final Geometric Layout1 23Final Intersection Details22Final Curb Ramp Details1 23Final Grading Details1 23Final Traffic Signal2 24Final Maintenance of Traffic1 23Bid Documents and Special Provisions2 4 612Quality Control1 23Final Cost Estimate1 2 47Final Design Review Meeting with City1 12Bid Process1 1 13INDOT Permit1 4Total Hours0 9 28 52 13 0 102Cost per Hour $215.00 $160.00 $130.00 $100.00 $80.00 $110.00Total Cost by Classification $0.00 $1,440.00 $3,640.00 $5,200.00 $1,040.00 $0.00Design Total$11,320.00Budget$11,400.00APPENDIX "A-1"Phase 2i - Howard Street and SR 23 IntersectionDesignStaffhour JustifcationAbonmarche Consultants, Inc.City of South BendHoward Street Conceptual DesignOctober 27, 2020DESCRIPTIONSTAFFHOURS BY CLASSIFICATION