Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Seitz Park Reconstruction <br />Project Number: 117-093A <br />For Bids Due: November 24, 2020 <br />Contractor Name: <br />A-28 I <br />Compacted Aggregate, No. 53 <br />90 <br />TON <br />62.77 <br />$5,649 <br />A-29 <br />Sidewalk, 6 -in <br />116 <br />SYS <br />120.52 <br />$13,980 <br />A-30 <br />Straight Curb <br />84 <br />LFT <br />35.93 <br />$3,018 <br />A-31 <br />Sidewalk, 6 -in, Integral Color, Finish "A" <br />137 <br />SYS <br />122.76 <br />$16,817 <br />A-32 <br />Sidewalk, 6 -in, Integral Color, Finish "B" <br />24 <br />SYS <br />128.59 <br />$3,086 <br />A-33 <br />Concrete Walk False Joints <br />284 <br />LFT <br />12.56 <br />$3,565 <br />A-34 <br />Expansion Joint, Concrete Walk <br />234 <br />LFT <br />4.45 <br />$1,041 <br />A-35 <br />Sidewalk Joint Transitions <br />104 <br />LFT <br />2.52 <br />$262 <br />A-36 <br />Unit Paver <br />38 <br />SYS <br />236.43 <br />$8,984 <br />A-37 <br />Litter Receptacle <br />1 <br />EACH <br />1,630.00 <br />$1,630 <br />A-38 <br />Recycling Receptacle <br />1 <br />EACH <br />1,630.00 <br />$1,630 <br />A-39 <br />Bench <br />6 <br />EACH <br />1,733.84 <br />$10,403 <br />A-40 <br />Tree Grate <br />1 <br />EACH <br />4,575.00 <br />$4,575 <br />A-41 <br />Type 5 Rail with Custom Infill Panel, 48 inch <br />156 <br />LFT <br />387.03 <br />$60,376 <br />A-42 <br />Type 5 Rail with Custom Infill Panel, Custom <br />Curved, 48 inch <br />131 <br />LFT <br />418.41 <br />$54,811 <br />A-43 <br />Lighting, Pole, 12 ft <br />5 <br />EACH <br />5,273.60 <br />$26,368 <br />A-44 <br />Foundation, Lighting <br />5 <br />EACH <br />1,595.80 <br />$7,979 <br />A-45 <br />Luminaire, Type L1A <br />5 <br />EACH <br />4,355.00 <br />$21,775 <br />A-46 <br />PVC Conduit, 0.75 inch <br />75 <br />LFT <br />6.34 <br />$475 <br />A-47 <br />PVC Conduit, 1.5 inch <br />275 <br />LFT <br />10.71 <br />$2,945 <br />A-48 <br />Wire, 3#6, No 6 AWG, Stranded Copper <br />275 <br />LFT <br />6.88 <br />$1,892 <br />A-49 <br />Mobilization and Demobilization for Sodding <br />2 <br />EACH <br />460.50 <br />$921 <br />A-50 <br />Topsoil <br />4 <br />CYS <br />63.50 <br />$254 <br />A-51 <br />Sodding, Nursery <br />33 <br />SYS <br />11.52 <br />$380 <br />A-52 <br />Excelsoir Blanket <br />357 <br />SYS <br />2.88 <br />$1,027 <br />A-53 <br />Shredded Hardwood Mulch <br />21 <br />CYS <br />86.34 <br />$1,813 <br />A-54 <br />Deciduous Tree, 2.5 inch caliper <br />6 <br />EACH <br />632.84 <br />$3,797 <br />A-55 <br />Coniferous Shrubs, No. 3 Cont <br />47 <br />EACH <br />57.54 <br />$2,704 <br />A-56 <br />Shrubs, No. 3 Cont. <br />221 <br />EACH <br />51.78 <br />$11,443 <br />A-57 <br />Perennials, No. 1 Cont. <br />243 <br />EACH <br />14.39 <br />$3,495 <br />A-58 <br />Ornamental Grasses, No. 1 Cont. <br />106 <br />EACH <br />19.57 <br />$2,074 <br />A-59 <br />Planting Mixture <br />122 <br />CYS <br />86.30 <br />$10,528 <br />Version 4/2/2019 Contractor's Bid for Public Works - 8 <br />