BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Seitz Park Reconstruction
<br />Project Number: 117-093A
<br />For Bids Due: November 24, 2020
<br />Contractor Name:
<br />BID PACKAGE NO. 1 (Division A through E)
<br />DIVISION A - BASE BID
<br />Item
<br />No.
<br />Line Item
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />A-1
<br />Remediation Allowance
<br />1
<br />LSUM
<br />10,000.00
<br />$10,000
<br />A-2
<br />Maintenance of Traffic
<br />1
<br />LSUM
<br />3,661.00
<br />$3,661
<br />A-3
<br />Permit Compliance Administration
<br />1
<br />LSUM
<br />5,000.00
<br />$5,000
<br />A-4
<br />Mobilization and Demobilization
<br />1
<br />LSUM
<br />114,791.00
<br />$114,791
<br />A-5
<br />Construction Engineering
<br />1
<br />LSUM
<br />9,414.00
<br />$9,414
<br />A-6
<br />Video Record
<br />1
<br />LSUM
<br />1,569.00
<br />$1,569
<br />A-7
<br />Temporary Erosion and Sediment Control
<br />1
<br />LSUM
<br />2,877,00
<br />$2,877
<br />A-8
<br />Temporary Drop Inlet Protection
<br />1
<br />EACH
<br />262.00
<br />$262
<br />A-9
<br />Construction Access Drive
<br />1
<br />EACH
<br />2,092.00
<br />$2,092
<br />A-10
<br />Clearing, Right of Way
<br />1
<br />LSUM
<br />1,569.00
<br />$1,569
<br />A-11
<br />Sidewalk, Concrete, Removal
<br />481
<br />SYS
<br />13.60
<br />$6,541
<br />A-12
<br />Wall, Concrete, Removal
<br />65
<br />LFT
<br />627.60
<br />$40,794
<br />A-13
<br />Wall, Concrete, Partial Removal
<br />225
<br />LFT
<br />83.68
<br />$18,828
<br />A-14
<br />Gabions, Remove and Salvage
<br />190
<br />CYS
<br />52.30
<br />$9,937
<br />A-15
<br />Lighting Structure, Removal
<br />4
<br />EACH
<br />387.50
<br />$1,550
<br />A-16
<br />Excavation, Common
<br />1630
<br />CYS
<br />52.30
<br />$85,249
<br />A-17
<br />Borrow, B
<br />1249
<br />CYS
<br />41.85
<br />$52,259
<br />A-18
<br />Geofoam Lightweight Fill
<br />750
<br />CYS
<br />251.04
<br />$188,280
<br />A-19
<br />Pipe, Type 4, 6 in
<br />240
<br />LFT
<br />26.15
<br />$6,276
<br />A-20
<br />Aggregates for Underdrains
<br />9
<br />CYS
<br />78.56
<br />$707
<br />A-21
<br />Salvaged Gabion Material, Install
<br />190
<br />CYS
<br />52.30
<br />$9,937
<br />A-22
<br />Concrete, C, Superstructure
<br />185
<br />CYS
<br />482.28
<br />$89,221
<br />A-23
<br />Concrete, B, Footings
<br />400
<br />CYS
<br />464.44
<br />$185,773
<br />A-24
<br />Concrete, A, Planter Wall
<br />12
<br />CYS
<br />960.59
<br />$11,527
<br />A-25
<br />Concrete Topping Slab, Integral Color, Finish
<br />237
<br />SYS
<br />74.28
<br />$17,602
<br />A-26
<br />Concrete Topping Slab, Integral Color, Finish
<br />231
<br />SYS
<br />74.27
<br />$17,156
<br />A-27 -
<br />Subgrade Treatment, Type ill
<br />406
<br />SYS
<br />524
<br />$2,124
<br />Version 4/2/2019 Contractor's Bid for Public Works - 7
<br />
|