Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Seitz Park Reconstruction <br />Project Number: 117-093A <br />For Bids Due: November 24, 2020 <br />Contractor Name: <br />A-60 <br />Metal Edging <br />130 <br />1 LFT <br />1 1.16 <br />$150 <br />A-61 <br />Irrigation System <br />1 <br />LSUM <br />34,445.00 <br />$34,445 <br />DIVISION A TOTAL <br />DIVISION B - BASE BID <br />$1,219,285 <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />B-1 <br />Remediation Allowance <br />1 <br />LSUM <br />10,000.00 <br />$10,000 <br />B-2 <br />Maintenance of Traffic <br />1 <br />LSUM <br />3,138.00 <br />$3,138 <br />B-3 <br />Permit Compliance Administration <br />1 <br />LSUM <br />5,000.00 <br />$5,000 <br />B-4 <br />Mobilization and Demobilization <br />1 <br />LSUM <br />201,545.00 <br />$201,545 <br />B-5 <br />Construction Engineering <br />1 <br />LSUM <br />9,414.00 <br />$9,414 <br />B-6 <br />Video Record <br />1 <br />LSUM <br />1,256.00 <br />$1,256 <br />B-7 <br />Temporary Erosion and Sediment Control <br />1 <br />LSUM <br />2,877.00 <br />$2,877 <br />B-8 <br />Clearing, Right of Way <br />1 <br />LSUM <br />5,230.00 <br />$5,230 <br />B-9 <br />Sidewalk, Concrete, Removal <br />58 <br />SYS <br />13.61 <br />$789 <br />B-10 <br />Wall, Concrete, Removal <br />85 <br />LFT <br />470.71 <br />$40,010 <br />B-11 <br />Gabions, Remove and Salvage <br />108 <br />CYS <br />52.31 <br />$5,649 <br />B-12 <br />Excavation, Common <br />806 <br />CYS <br />52.31 <br />$42,154 <br />B-13 <br />Borrow, B <br />719 <br />CYS <br />41.85 <br />$30,083 <br />B-14 <br />Structural Backfill, Type 4 <br />315 <br />CYS <br />104.60 <br />$32,949 <br />B-15 <br />Geofoam Lightweight Fill <br />493 <br />CYS <br />251.05 <br />$123,763 <br />B-16 <br />Pipe, Type 4, 6 in <br />99 <br />LFT <br />26.16 <br />$2,589 <br />B-17 <br />Aggregates for Underdrains <br />4 <br />CYS <br />78,50 <br />$314 <br />B-18 <br />Manhole, Saddle Structure <br />1 <br />EACH <br />6,276.00 <br />$6,276 <br />B-19 <br />Casting, Type 4, Adjust to Grade <br />1 <br />EACH <br />262.00 <br />$262 <br />B-20 <br />Gabions, Metallic Coated <br />199 <br />CYS <br />559.62 <br />$111,363 <br />B-21 <br />Pneumatically Placed Mortar <br />1405 <br />SFT <br />33.51 <br />$47,070 <br />B-22 <br />Salvaged Gabion Material, Install <br />108 <br />CYS <br />52.31 <br />$5;649 <br />B-23 <br />Pile, Steel Pipe, 0.5 inch, 12.75 inch <br />400 <br />LFT <br />104.60 <br />$41,840 <br />B-24 <br />Dynamic Pile Load Test, 12.75 inch <br />2 <br />EACH <br />4,184.00 <br />$8,368 <br />B-25 <br />Structural Steel, Galvanized <br />21,336 <br />LBS <br />2.79 <br />$59,518 <br />B-26 <br />Concrete, C, Superstructure <br />123 <br />CYS <br />670.07 <br />$82,418 <br />Version 4/2/2019 Contractor's Bid for Public Works - 9 <br />