My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10132020 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2020
>
10132020 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:15:08 PM
Creation date
10/29/2020 9:17:01 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />OCTOBER 13, 2020 176 <br />Division D: Building 14 Alternate #2 1 $10,158 <br />Item <br />No. <br />Description <br />DEDUCT/SF <br />ADD/SF <br />1 <br />Masonry Brick Tuck -pointing er SF <br />35 <br />45 <br />2 <br />Soft Joint Repointing er LF <br />6 <br />10 <br />3 <br />Masonry Brick Re- <br />buildin a lacement per SF <br />125 <br />210 <br />4 <br />Brick and Limestone Cleaning er SF <br />1 <br />1.5 <br />5 <br />Concrete roof topping repair per SF <br />BERGLUND CONSTRUCTION COMPANY <br />8410 S. South Chicago Ave. <br />Chicago, IL 60617 <br />awilson@,berglundco.com <br />Bid was signed by Mr. Jack Tribbia <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />:o <br />Division A Total — <br />Building 8 <br />$150,000.00 <br />Division B Total — <br />Building 9 <br />$160,000.00 <br />Division C Total — <br />Building 10 <br />$65,000.00 <br />Division D Total — <br />Building 14 <br />$375,000.00 <br />Division D Total <br />— Building 14 Alternate #1 <br />Zero Dollars <br />Division D Total <br />— Building 14 Alternate #2 Bid Total <br />$15,000.00 <br />TOTAL BASE BID PLUS ALTERNATES $765,000.00 <br />Item <br />No. <br />Description <br />DEDUCT/SF <br />ADD/SF <br />1 <br />Masonry Brick Tuck -pointing er SF <br />15 <br />20 <br />2 <br />Soft Joint Repointing er LF <br />7 <br />10 <br />3 <br />Masonry Brick Re- <br />building/Replacement per SF <br />60 <br />75 <br />4 <br />Brick and Limestone Cleaning per SF <br />1.501 <br />2.25 <br />5 <br />1 Concrete roof topping repair per SF <br />70 <br />1 100 <br />Attorney McDaniels noted that Larson -Danielson Construction Co. didn't provide division totals. <br />The bid was forwarded to Mr. Jacob Klosinski, Engineering, to total the division lines. His totals <br />were read into the record. Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and <br />carried by roll call, the above bids were referred to Engineering for review and recommendation. <br />OPENING OF BIDS — FOUR (4). MORE OR LESS. 2020 OR NEWER STANDARD AWD 4- <br />DOOR UTILITY VEHICLES — SPEC I (PR-00003050) <br />This was the date set for receiving and opening of sealed bids for the above referenced vehicle. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bid was opened and publicly read: <br />JORDAN FORD <br />609 E. Jefferson Blvd. <br />Mishawaka, IN 46545 <br />dstarkweather@jordanauto.com <br />Bid was signed by Ms. Debra Starkweather <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Ten percent (10%) Bid Bond was submitted <br />Indiana Local Business Preference Claim completed <br />0 <br />Description <br />Year/Make/Model <br />I Unit Price <br />4 Door Utility <br />2021 Ford Escape AWD <br />1 $24,739.00 Each <br />
The URL can be used to link to this page
Your browser does not support the video tag.