TECHNICAL APPROACH: COLLABORATION WITH ENGINEERS
<br />CITY OF SOUTH BEND: PINHOOK WTP IMPROVEMENTS PROJECT GUARANTEED SAVINGS CONTRACT
<br />REYNOLDS’ COLLABORATIVE DELIVERY EXPERIENCE LIST – LAST 10 YEARS
<br />PROJECT NAMECITYSTCOMPLETION ENGINEERCONTRACT
<br />DATEAMOUNT
<br />Parkville Water Treatment Parkville MO6/15/2018 Black & Veatch $20,694,969
<br />Plant
<br />Aqua Neshaminy WTPOakfordPA 5/24/2018 Mott MacDonald $4,625,440
<br />2015 Lift Station IndianapolisIN6/16/2017The Etica Group$2,084,818
<br />Preplacement–Package #3
<br />(Lift Stations; 221 & 320)
<br />Design-Build Services for Miami ShoresFL2/30/2017 CPH, Inc. $3,200,000
<br />Central Business District
<br />LPSS and WM Imps
<br />DDCWSA Sweetwater Creek Douglasville GA2/1/2017McKim & Creed $536,836
<br />Side Stream Filter Retrofit
<br />2015 Lift Station IndianapolisIN10/13/2016The Etica Group$1,183,441
<br />Preplacement–Package #1
<br />(Lift Stations; 208, 301, 304
<br />and 305)
<br />Kiewit-TVA Raw WaterDrakesboro KY 7/29/2016 Bell Engineering$12,793,099
<br />Withlacoochee Water Valdosta GA7/29/2016 Parsons Water & $23,200,000
<br />Pollution Control Plant Infrastructure
<br />Design-Build
<br />DBO-Wastewater System IslamoradaFL5/29/2016 ARCADIS $97,800,000
<br />Construction
<br />Confidential Upper US1/1/2016Confidential$4,241,761
<br />Midwest
<br />St. Brides Correctional Facility Chesapeake VA 8/15/2014 Ignatius Mutoti, PhD, PE, $1,759,162
<br />WTP Upgrade City BCEE
<br />Withlacoochee WWTP Valdosta GA6/30/2014 Parsons Water & $1,551,315
<br />Emergency Infrastructure
<br />Fort Polk North & South Fort Polk LA 6/25/2014 AECOM $5,585,192
<br />WWTP Short Term
<br />Improvements
<br />Jacobson Reservoir Pump LexingtonKY 5/30/2014 Gannett Fleming $3,171,506
<br />Improvement Project
<br />Centralized Wastewater LouisvilleKY 2/14/2014 CDM Smith$2,697,460
<br />Treatment and Receiving
<br />Facility Ph. 1
<br />EPC Services for Wet AD and OrlandoFL12/15/2013ENVIRON and PMC Bio $25,924,843
<br />Nutrient Recovery in Florida Tec
<br />Fond du Lac HMO WTP Fond du Lac WI 11/1/2013 Strand Engineers $4,393,732
<br />Conversion
<br />Northlands Lift Station Force Broomfield CO 10/25/2013Burns and McDonnell $3,125,092
<br />Mains -Phase I
<br />NAVFAC Kings BayGA11/21/2012ARCADIS US $4,086,895
<br />Trident Refit Facility Repair
<br />South Transmission Line Nashville TN 10/1/2012 Smith, Seckman, Reid, $8,804,260
<br />Tunnel 6th AvenueInc. (SSR)
<br />Grand Gulf Nuclear Station Port Gibson MS 7/25/2012 Burns & McDonnell $14,895,409
<br />Radial Well #6
<br />Page | 33