Laserfiche WebLink
TECHNICAL APPROACH: COLLABORATION WITH ENGINEERS <br />CITY OF SOUTH BEND: PINHOOK WTP IMPROVEMENTS PROJECT GUARANTEED SAVINGS CONTRACT <br />REYNOLDS’ COLLABORATIVE DELIVERY EXPERIENCE LIST – LAST 10 YEARS <br />PROJECT NAMECITYSTCOMPLETION ENGINEERCONTRACT <br />DATEAMOUNT <br />Parkville Water Treatment Parkville MO6/15/2018 Black & Veatch $20,694,969 <br />Plant <br />Aqua Neshaminy WTPOakfordPA 5/24/2018 Mott MacDonald $4,625,440 <br />2015 Lift Station IndianapolisIN6/16/2017The Etica Group$2,084,818 <br />Preplacement–Package #3 <br />(Lift Stations; 221 & 320) <br />Design-Build Services for Miami ShoresFL2/30/2017 CPH, Inc. $3,200,000 <br />Central Business District <br />LPSS and WM Imps <br />DDCWSA Sweetwater Creek Douglasville GA2/1/2017McKim & Creed $536,836 <br />Side Stream Filter Retrofit <br />2015 Lift Station IndianapolisIN10/13/2016The Etica Group$1,183,441 <br />Preplacement–Package #1 <br />(Lift Stations; 208, 301, 304 <br />and 305) <br />Kiewit-TVA Raw WaterDrakesboro KY 7/29/2016 Bell Engineering$12,793,099 <br />Withlacoochee Water Valdosta GA7/29/2016 Parsons Water & $23,200,000 <br />Pollution Control Plant Infrastructure <br />Design-Build <br />DBO-Wastewater System IslamoradaFL5/29/2016 ARCADIS $97,800,000 <br />Construction <br />Confidential Upper US1/1/2016Confidential$4,241,761 <br />Midwest <br />St. Brides Correctional Facility Chesapeake VA 8/15/2014 Ignatius Mutoti, PhD, PE, $1,759,162 <br />WTP Upgrade City BCEE <br />Withlacoochee WWTP Valdosta GA6/30/2014 Parsons Water & $1,551,315 <br />Emergency Infrastructure <br />Fort Polk North & South Fort Polk LA 6/25/2014 AECOM $5,585,192 <br />WWTP Short Term <br />Improvements <br />Jacobson Reservoir Pump LexingtonKY 5/30/2014 Gannett Fleming $3,171,506 <br />Improvement Project <br />Centralized Wastewater LouisvilleKY 2/14/2014 CDM Smith$2,697,460 <br />Treatment and Receiving <br />Facility Ph. 1 <br />EPC Services for Wet AD and OrlandoFL12/15/2013ENVIRON and PMC Bio $25,924,843 <br />Nutrient Recovery in Florida Tec <br />Fond du Lac HMO WTP Fond du Lac WI 11/1/2013 Strand Engineers $4,393,732 <br />Conversion <br />Northlands Lift Station Force Broomfield CO 10/25/2013Burns and McDonnell $3,125,092 <br />Mains -Phase I <br />NAVFAC Kings BayGA11/21/2012ARCADIS US $4,086,895 <br />Trident Refit Facility Repair <br />South Transmission Line Nashville TN 10/1/2012 Smith, Seckman, Reid, $8,804,260 <br />Tunnel 6th AvenueInc. (SSR) <br />Grand Gulf Nuclear Station Port Gibson MS 7/25/2012 Burns & McDonnell $14,895,409 <br />Radial Well #6 <br />Page | 33 <br /> <br />