My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Reynolds Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Reynolds Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 1:08:04 PM
Creation date
10/14/2020 1:07:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TECHNICAL APPROACH: COLLABORATION WITH ENGINEERS <br />CITY OF SOUTH BEND: PINHOOK WTP IMPROVEMENTS PROJECT GUARANTEED SAVINGS CONTRACT <br />COLLABORATION WITH ENGINEERS <br />C. American Structurepointwill be the engineer of record to work with the selected Provider. Explain the <br />Provider’s experiences collaborating with Engineers on past design-build or guaranteed savings contract <br />water/wastewater projects. <br />“Reynolds Construction, LLC would be a great fit <br />Design-build construction is what we do – everyday <br />for any water project, whether deliveredin the <br />throughout the country. We’ve been doing it for decades and <br />traditional design-build format or in a construction <br />appreciate the value it creates for our owners. We have <br />manager at risk format. <br />included a list of our past experience with Collaborative <br />Delivery projects below and on the following pages. <br />Gannett Fleming highly recommends Reynolds <br />Construction, LLC as a teaming partner for your <br />Lessons learned: Over the years, we have learned much by <br />water project.” <br />noting what does and doesn’t work for our clients’ specific <br /> <br />project circumstances. We’ve bid and constructed projects <br />Very Truly Yours, <br />designed by dozens of firms throughout Indiana and the <br />Jeff Raffensperger <br />United States. Some design approaches are costly, while <br />Vice President, Principal Project Manager Water <br />others are creative and save both time and money. The GSC <br />Practice <br />model is a great way for us to bring our lessons learned to the <br />Gannett Fleming, Inc. <br />City of South Bend. We look forward to the opportunity to <br />share these thoughts with the team. <br />REYNOLDS’ COLLABORATIVE DELIVERY EXPERIENCE LIST – LAST 10 YEARS <br />PROJECT NAME CITY ST COMPLETION ENGINEERCONTRACT <br />DATE AMOUNT <br />Hopewell WTP Industrial PS HopewellVA 4/23/2021 Gannett Fleming $23,000,000 <br />Electrical Bldg, Chemical and <br />UV Facilities DB Project <br />Bio-Solids Facility Digester- Nashville TN 1/3/2021Smith, Seckman, Reid, $19,300,000 <br />Design Build Inc. <br />Effluent Disposal SystemNorthwestFL11/1/2020 Confidential<$50,000,000 <br />Eastern Pipeline ProjectDouglas Co.CO 10/31/2020Providence Infrastructure $41,119,770 <br />Consultants <br />Muncie Water Treatment Muncie IN9/30/2020 Gannett Fleming $18,837,844 <br />Facility Phase 2 <br />Presidents Street Bio-Solids SavannahGA7/15/2020 Parsons $21,335,800 <br />Dryer Facility <br />Water Treatment Plant Confidential NJ 6/30/2020 Confidential>$9,000,000 <br />Allisonville Road Water Noblesville IN5/31/2020 Gannett Fleming $17,083,911 <br />Treatment Plant Facility <br />Newburgh WTP Consolidation NewburghIN3/30/2020 Black & Veatch $3,498,997 <br />& Chlorine Conversion <br />Marlin and Orme WTF Greenwood IN8/21/2019 Black & Veatch $1,968,741 <br />Chlorine Gas Conversion DB <br />Project <br />Cudjoe Regional Outer Monroe Co. FL2/6/2019Chen Moore and Assoc. $104,070,192 <br />Islands Eckler Engineering <br />Wastewater Collection System ARCADIS <br />Design-Build <br />Canyon Hess-Water Resource ParkerCO 9/9/2018Overland Contracting $13,630,148 <br />Centralization Project <br />Page | 32 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.