LƓķźğƓğğƷĻƩΉğƭƷĻǞğƷĻƩ9ǣƦĻƩźĻƓĭĻ
<br />ΛtğƩƷźğƌƌźƭƷƦğƭƷЊЉǤĻğƩƭΜ
<br />CompletionContractProjectProject
<br />ProjectNameCitySTEngineerDescription
<br />DateAmountManagerSuperintendent
<br />Increasedthecapacityoftheexistingplantinorderto
<br />minimize/eliminateoverflowsduringwetweather.Improvedscreening
<br />Donohue&
<br />MitchellWWTPImprovementsMitchellIN9/13/2016$2,573,269DaleFleenorBradGutgselloftherawsewageenteringthewastewatertreatmentplant.Repaired
<br />Associates,Inc.
<br />orreplacedsomeoftheagingequipmentandtoupgradetheexisting
<br />electricalsystem.
<br />William
<br />ThompsonWilliamThompson
<br />StadlerLiftStationandForceMain(Plant)(Plant)NewLiftStationwith8MGDwithsanitarysewersinstalledbyHDD
<br />ColumbusIN8/1/2016GRWEngineers$2,947,933
<br />acrossthecreek.
<br />(and3rdSt.LiftStationDemolition)
<br />JasonDavisTonyStalker(Utilities)
<br />(Utilities))
<br />Projectincludedinstallationofapproximately800LFofPVCSewer,
<br />106thStreetWastewaterFacilitiesRandy
<br />FishersIN7/1/2016VSEngineering$1,900,149TonyStalker1,750LFofDIPForceMain,withaboreof340LFwithincasing
<br />RelocationTummers
<br />pipeand360LFHDPEviaHDD.
<br />Approx.8,125LFofnewsewerinterceptorpipe,installedata
<br />Steven
<br />CommonwealthJohhnyGibson,depthof15feet,toreplaceagingsewermain.(Approx.1,375LF
<br />IN6/11/2015
<br />EastSideInterceptorReplacementRichmond$12,883,259Mainord,
<br />EngineersTimwinchellconstructedbytraditionalopencutmethod.Approx.6,750LF
<br />BrianRieschick
<br />constructedbytrenchlesstunnelingutilizingatunnelboringmachine.)
<br />Phase1:StructuralmodificationstotheexistingWetWeatherBasinto
<br />increasedcapacityandrelocatingtheinjectionpointsforsodium
<br />hypochloriteandsodiumbisulfitetreatment.
<br />2014WWTPProj
<br />IN5/27/2015WesslerEngineering$1,240,955DaleFleenorBradGutgsell
<br />WestLafayette
<br />Phase2:ConsistedoftheconstructionofanewChemicalBuildingto
<br />Area1&Area2Phase1
<br />houseSodiumAluminatetanks,pumps,pipingandequipmentdesigned
<br />forphosphorusremovalfromthewastewater.
<br />Thisprojectconsistedofinstallingapprox2,000LFof24"36"HDPE
<br />BelmontAdvancedWWTPLow
<br />forcemainalongwithasectionofcuredinplacepipingtoreplace
<br />PressureSecondaryEffluentForceIndianapolisIN9/30/2014TheEticaGroup$1,608,612JasonDavisTonyStalker
<br />theexistingsecondaryeffluentforcemainwhichhasbecomevery
<br />MainReplacement
<br />pronetofailure.
<br />Thisprojectconsistedofconstructinganewboosteradjacenttothe
<br />existingboosterstation.Itincludedthree(3)newhorizontialsplitcase
<br />WaterSystemImprovementsNew
<br />Midwesternpumps,ductileironflangeandundergroundpiping,castinplace
<br />FloydsKnobsIN3/25/2014$682,237SteveArvinCharlieCole
<br />BoosterStationonDuffyRd.
<br />Engineers,Inc.concrete,masonrywork,processvalves,painting,heating/air
<br />conditioning,standbygeneratorsystem,electricalworkandselect
<br />demolitionoftheexistingboosterstation.
<br />WorkforSectionIincludedconstructionofanewpumpstation,anew
<br />SoutheastWaterSystem
<br />valvevault,anew2milliongallonwaterstoragetank,mechanical,
<br />Improvements,SectionIPumpBloomingtonIN11/7/2013Black&Veatch$6,537,208SteveArvinDaveFee
<br />electrical,andinstrumentationwork,sitework,andother
<br />StationandTank
<br />miscellaneousworkasrequired
<br />InstallationofUV/AOPEquipmentprocuredbytheDistrictfromTrojan
<br />Technologies;InterconnectingPlantPiping;EQChamber;UVRoom
<br />Midwestern
<br />PatokaPhVIIDivIIIUV/AOPDuboisIN12/11/2012$6,685,073DaleFleenorBradGutgsell(Block&Concrete);260,00GallonQuenchTank;ChlorinationRoom
<br />Engineers,Inc.
<br />overQuenchTank;ChlorinationEquipment;AmmoniaEquipment;
<br />StandbyGenerator
<br />Page | 21