Laserfiche WebLink
LƓķźğƓğ‘ğƷĻƩΉ‘ğƭƷĻǞğƷĻƩ9ǣƦĻƩźĻƓĭĻ <br />ΛtğƩƷźğƌƌźƭƷƦğƭƷЊЉǤĻğƩƭΜ <br />CompletionContractProjectProject <br />ProjectNameCitySTEngineerDescription <br />DateAmountManagerSuperintendent <br />WWTPImprovementsincluding:Demolitionofthree(3)steelsludge <br />treatmenttanks(1120'diameter,&275'diameter),preengineered <br />sludgepress/chemicalbuilding,existingmaintenancegarages,& <br />existingchlorinecontacttank;Renovationstotheexistingsludge <br />Commonwealth <br />WWTPImprovementsNewburghIN7/20/2012 <br />$20,116,843SteveArvinEarlCaudillblowerbuilding,existingSBRblowerbuilding,existingadmin/control <br />Engineers <br />building,existingheadworksbuilding,andexistingSBRtanks4&5; <br />Sludgeremoval;Newconstructionoftwo(2)sludgetreatmenttanks <br />(106'diameter),newsludgeblowerbuilding,newSBRblowerbuilding, <br />newgritremovalbuilding,newSBRtanks6,7&8;&more <br />Phase1NewheadworksProjectNewHeadworksstructurewith <br />JimmyModglin <br />approx.1,600CYconcrete,newequipmentincludingAutoBarScreens, <br />WWTPAdditionsandImprovements <br />IN6/29/2012HNTBCorporation$6,896,032DanClarkDavidHammond,Asst <br />TerreHaute <br />twinPistaGrits,GritWashers&compactors,approx.930'of36",450'of <br />PhINewHeadworks <br />Superintendent <br />48",450'of30"&othermisc.pipe. <br />AddedanInfluentPumpStationwithautomaticscreeningequipment. <br />Bernardin, <br />BrandonThesewageisthenpumpedbyforcemaintothenewGritRemoval <br />MadisonWWTPImprovementsMadisonIN3/1/2012Lochmueller,&$2,773,061KeithHollingsworth <br />TarvinSystem.Modificationsarealsobeingmadetotheclarifierstructuresby <br />Associates,Inc <br />replacingcollectionequipment. <br />WWTPModificationsProjectcentersaroundnewodorcontrolsystem <br />CommonwealthconsistingofanewThermalProcessSystemBioFilterandAeration <br />WWTPModificationsFranklinIN3/1/2012$2,030,782DanClarkDavidFee <br />EngineersSystem,anewUVandNPWStructure,anewBarScreen@theexisting <br />Headworks,andothermiscellaneoussiteimprovements <br />Increasedpeakflowfrom10to20MGD;Theexpansionconsistedof: <br />adding/converting4equalizationbasinsintonewprimaryclarifiers, <br />twonew(90'x130')AerationTanks,twonew(90'DIA)Secondary <br />AndyZalla& <br />HNTBCorporation$18,172,751 <br />WWTPUpgradePhaseIINoblesvilleIN11/3/2010JimmyModglinClarifiers,renovationoftheexistingchlorinecontactdisinfectiontank <br />DanClark <br />intoaUVdisinfectiontank,&anewEffluentPlantpumpingstation.The <br />existingfourPrimaries,twoAerationtanks,&twosecondaryclarifiers <br />rehabilitated <br />Page | 22 <br /> <br />