My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Reynolds Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Reynolds Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 1:08:04 PM
Creation date
10/14/2020 1:07:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LƓķźğƓğğƷĻƩΉğƭƷĻǞğƷĻƩ9ǣƦĻƩźĻƓĭĻ <br />ΛtğƩƷźğƌƌźƭƷƦğƭƷЊЉǤĻğƩƭΜ <br />CompletionContractProjectProject <br />ProjectNameCitySTEngineerDescription <br />DateAmountManagerSuperintendent <br />WWTPImprovementsincluding:Demolitionofthree(3)steelsludge <br />treatmenttanks(1120'diameter,&275'diameter),preengineered <br />sludgepress/chemicalbuilding,existingmaintenancegarages,& <br />existingchlorinecontacttank;Renovationstotheexistingsludge <br />Commonwealth <br />WWTPImprovementsNewburghIN7/20/2012 <br />$20,116,843SteveArvinEarlCaudillblowerbuilding,existingSBRblowerbuilding,existingadmin/control <br />Engineers <br />building,existingheadworksbuilding,andexistingSBRtanks4&5; <br />Sludgeremoval;Newconstructionoftwo(2)sludgetreatmenttanks <br />(106'diameter),newsludgeblowerbuilding,newSBRblowerbuilding, <br />newgritremovalbuilding,newSBRtanks6,7&8;&more <br />Phase1NewheadworksProjectNewHeadworksstructurewith <br />JimmyModglin <br />approx.1,600CYconcrete,newequipmentincludingAutoBarScreens, <br />WWTPAdditionsandImprovements <br />IN6/29/2012HNTBCorporation$6,896,032DanClarkDavidHammond,Asst <br />TerreHaute <br />twinPistaGrits,GritWashers&compactors,approx.930'of36",450'of <br />PhINewHeadworks <br />Superintendent <br />48",450'of30"&othermisc.pipe. <br />AddedanInfluentPumpStationwithautomaticscreeningequipment. <br />Bernardin, <br />BrandonThesewageisthenpumpedbyforcemaintothenewGritRemoval <br />MadisonWWTPImprovementsMadisonIN3/1/2012Lochmueller,&$2,773,061KeithHollingsworth <br />TarvinSystem.Modificationsarealsobeingmadetotheclarifierstructuresby <br />Associates,Inc <br />replacingcollectionequipment. <br />WWTPModificationsProjectcentersaroundnewodorcontrolsystem <br />CommonwealthconsistingofanewThermalProcessSystemBioFilterandAeration <br />WWTPModificationsFranklinIN3/1/2012$2,030,782DanClarkDavidFee <br />EngineersSystem,anewUVandNPWStructure,anewBarScreen@theexisting <br />Headworks,andothermiscellaneoussiteimprovements <br />Increasedpeakflowfrom10to20MGD;Theexpansionconsistedof: <br />adding/converting4equalizationbasinsintonewprimaryclarifiers, <br />twonew(90'x130')AerationTanks,twonew(90'DIA)Secondary <br />AndyZalla& <br />HNTBCorporation$18,172,751 <br />WWTPUpgradePhaseIINoblesvilleIN11/3/2010JimmyModglinClarifiers,renovationoftheexistingchlorinecontactdisinfectiontank <br />DanClark <br />intoaUVdisinfectiontank,&anewEffluentPlantpumpingstation.The <br />existingfourPrimaries,twoAerationtanks,&twosecondaryclarifiers <br />rehabilitated <br />Page | 22 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.