LƓķźğƓğğƷĻƩΉğƭƷĻǞğƷĻƩ9ǣƦĻƩźĻƓĭĻ
<br />ΛtğƩƷźğƌƌźƭƷƦğƭƷЊЉǤĻğƩƭΜ
<br />CompletionContractProjectProject
<br />ProjectNameCitySTEngineerDescription
<br />DateAmountManagerSuperintendent
<br />Newgroundwaterplantindependentfromtheexistingplant.Thenew
<br />plantcapacityis6.0MGDexpandableto10MGD.Included:
<br />AerationDetentionTank(steelconstruction);Typicalchemicalfeed
<br />AllisonvilleRdWaterTreatment
<br />NoblesvilleIN5/15/2020GannettFleming$17,083,911DanClarkDavidHammondrooms; ThreehorizontalPressureFilters;BackwashTanksburiedwith
<br />Facility
<br />precastlids;1.0MGClearWell(posttensionedconcrete);Threeeach
<br />highservicepumps;Onenewgroundwaterwellof1.5MG;
<br />Modificationstoanexistingwell
<br />Replaceflocculatorequipmentandbafflewalls.Repairconcretetanks
<br />TWMosesBasinIndianapolisIN4/30/2020CMID$1,935,200AdamRalphBryanWeber
<br />whiledown
<br />Newwatertreatmentplant,includinganewforcedaerationunit,two
<br />newhighservicepumps,newhorizontalpressurefilter,chemicalfeed
<br />TownofWolcott
<br />Commonwealthequipment,mechanicalandHVACsystems,newSCADAsystem,and
<br />WaterImprovementProjectDivisionWolcottIN3/25/2020$1,899,387MikeBenterBryanWeber
<br />Engineers,Incassociatedwatermains,valves,plumbing,sanitarysewers,earthwork,
<br />WaterTreatmentPlant
<br />electricalwork,connectionstoexistingwatermains,andallotherwork
<br />required
<br />Design,permittingandconstructionofallimprovementsincludinga
<br />proposed2MGDfilterexpansion,highservicespumpreplacement,a
<br />NewburghWTPConsolidation&
<br />Newburgh
<br />IN3/18/2020Black&Veatch$3,498,997JuanBlacuttBradGutgsellliquidchemicalstorage,feedandcontainmentsystemforsodium
<br />ChlorineConversion
<br />hypochlorite(12.5%),apermanentstandbygeneratorandinstallation
<br />ofa2MGDwellattheScuffletownWellfield.
<br />SubstantialConstructnewchemicalbuilding,newrawwaterintakeandpump
<br />MuncieWTFPhase2ImprovementsMuncieINJoelStillions
<br />GannettFleming$19,700,415AdamRalph
<br />10/21/2019station,addontotheexistingadminbuilding,andmisc.ancillarywork.
<br />ConvertedexistingchlorinegasinjectionsystematbothMarlinand
<br />OrmefacilitiestoSodiumHypochlorite.ProjectconsistedofnewFRP
<br />bulktanks,HDPEdaytanks,SCADAsystem,chemicalinjectiontransfer
<br />pumpsandfeedsystems,chemicalpiping,valvesandappurtenances.
<br />MarlinandOrmeWTFChlorineGasThechlorinegassystemhadtostayoperationaluntiltheconversion
<br />GreenwoodIN8/21/2019Black&Veatch$1,968,741JohnHallBradGutgsell
<br />ConversionDBProjecttookplace.
<br />Electrical,HVAC,Plumbing,Paintingandsitemodification/upgrade
<br />scopesofworkwereincludedtocompletetheconversion.New
<br />undergroundchemicalductbankswereinstalledwhileexisting
<br />undergroundchemicalpipingremainedinuse.
<br />Upgradeoftheexistingwastewatertreatmentplantincluding:new
<br />headworksstructurewithonemechanicalscreenandbypassbar
<br />screen,screeningswashercompactor,andfourrawsewagepumps;a
<br />newgritremovalsystemwithtwovortexgrittanksandagritclassifier
<br />inanewbuilding;newbiologicalselectorsystemwithananaerobic
<br />basin,phaseseparatortank,andpreanoxictank;twonewstaged
<br />aerationreactors;onenewsecondaryclarifierandrehabilitationoftwo
<br />existingclarifiers;anewreturnactivatedsludgepumpstation;twonew
<br />MonticelloWWTPImprovementsMonticelloIN11/30/2017WesslerEngineering$11,439,964DaleFleenorBudLandstrom
<br />mechanicalclothmediafiltersinstalledinexistinggravitysandmedia
<br />filtertanks;twonewinlineUVdisinfectionsunits;modificationstoan
<br />existinggritbuildingincludingtheadditionoftwonewalumstorage
<br />tanksandchemicalfeedequipment;threenewblowers,anelectrical
<br />roomandoffice/laboratoryspace;anewstandbypowergenerator;and
<br />allyardpiping,valves,electrical,instrumentation,controls,mechanical,
<br />paving,andsiteworknecessaryforacompleteinstallation
<br />Page | 20
<br />
<br />
|