My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 12:59:32 PM
Creation date
10/14/2020 12:59:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Djuz!pg!Tpvui!Cfoe <br />Sfrvftu!gps!Rvbmjgjdbujpot <br />Bowen does not stop trying to obtain the best overall price beyond the estimating stage. We <br />continue to do so in the construction phase following our storyboarding session. To date, Bowen has <br />delivered every GSC project estimated under budget. After construction was underway on these <br />projects, we saved an additional six million dollars through the following: <br /> Construction Engineering – Bowen has some of the most experienced superintendents in the <br /> Production Savings – Our project managers and project engineers are meeting every morning <br />on your job site to discuss better ways to install, which results in project savings. <br /> <br />experience. This experience assisted the City of Huntington in receiving an $80,000 custom utility <br />Lafayette receiving and $56,000 utility rebate, and recently, the Town of Rossville receiving a <br />$1,200 utility rebate. <br />Lastly, Bowen’s ability to obtain the best price for our owners has been proven over the past <br />has won multiple South Bend Water and Wastewater projects in recent years including the <br />was proven with the Olive Street WTP project when we worked with the City and the design <br />engineer to reduce our low bid project costs to meet the City’s budget. <br />In addition to our traditional low bid projects, the Northwest Bowen team has been selected <br />for and completed 10 successful GSCs. Our team’s success in the traditional and GSC <br />market is a testament to their cost competitiveness. <br />d*!!Fyqmbjo!ipx!uif!Qspwjefs!qmbot!up!pggfs!b!Hvbsbouffe!Nbyjnvn!Qsjdf-!xjui!op! <br />dibohf!psefst-!gps!uijt!qspkfdu/ <br />we will never ask for a change-order. We <br />use our estimating experience and construction expertise to include everything in the GMP with a <br />transparent and logic based contingency to collaboratively manage project needs. <br />e*!!Fyqmbjo!zpvs!gjsnt!bqqspbdi!up!pqfo!cppl!qsjdjoh!bmmpxjoh!uif!Djuz!up!wjfx! <br />$2!Qspwjefs!pg!Joejbob!Xbufs0Xbtufxbufs!HTDt <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.