My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 12:59:32 PM
Creation date
10/14/2020 12:59:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Djuz!pg!Tpvui!Cfoe <br />Sfrvftu!gps!Rvbmjgjdbujpot <br />b*!Uif!djuz!nbz!jnqmfnfou!uif!dbqjubm!jnqspwfnfout!jo!tfwfsbm!qibtft!pwfs!b!uisff! <br />)4*!up!gjwf!)6*!zfbs!qfsjpe/!Fyqmbjo!ipx!uif!Qspwjefs!xjmm!iboemf!b!qibtfe!qspkfdu! <br />bqqspbdi/! <br />Bowen has been a part of more phased GSC projects than all of our competition combined. <br />We recently worked with the City of Valparaiso, the City of Hobart, and the City of Delphi <br />through a phased GSC approach with the same Bowen operations team that is being <br />proposed in this response. We plan to treat your phased water project with the same detail. <br />tracking project costs, project savings and the additional work needed for each phase. Any <br />project savings can get transferred to the next phase to implement additional work with no <br />fee for that portion of the scope. We would handle your phased project with continuous <br />construct-ability advice and estimating resources. This means that we would storyboard/ <br />value engineer the entire 3-5 year program to better understand the overall water utility <br />program is on track. Bowen’s phased approach will ensure you are getting the maximum <br />project value with the funds available. <br />c*!Eftdsjcf!jo!efubjm!uif!qspdftt!uibu!uif!Qspwjefs!joufoet!up!vujmj{f!up!pcubjo! <br />uif!cftu!qsjdft!gps!uif!Pxofs/!Fyqmbjo!xiz!uijt!bqqspbdi!jt!cfuufs!uibo!puifs! <br />bwbjmbcmf!bqqspbdift/ <br />Bowen will strive to obtain the best prices for the City of South Bend throughout the entire GSC <br />Construction. In the estimating stage, the following makes Bowen’s approach the best in the <br />industry: <br /> <br />for the past 53 years, longer than any other provider. In addition, our operations team provides <br />collaborated on over 30 design build projects and 80+ GSCs. <br /> Equipment Pricing – Bowen’s size and great Indiana vendor relationships allow us to obtain <br />the best equipment/material pricing in the industry. To ensure competitive pricing we obtain <br />purchases. <br /> <br />team to make the most informed design decisions. <br /> Mark Up Reduction – Bowen is a Provider, Construction Manager and Self-Performing <br />Contractor that allows us to eliminate or reduce multiple layers of mark up on GSCs. Bowen <br />South Bend. <br />$2!Qspwjefs!pg!Joejbob!Xbufs0Xbtufxbufs!HTDt <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.