Laserfiche WebLink
Liberty Tower Exterior Renovations - Ph 2 <br />South Bend, Indiana <br />© Copyright, Kil Architecture / Planning <br />September 2020 <br />SECTION 07 2400 - EXTERIOR INSULATION AND FINISH SYSTEMS <br />PART 1 GENERAL <br />1.1 SECTION INCLUDES <br />A. Composite wall and soffit cladding of rigid insulation and reinforced finish coating (Class PB). <br />B. Incidental uses of same finish coating applied directly to concrete and masonry. <br />1.2 RELATED REQUIREMENTS <br />A. Section 07 9200 -Joint Sealants: Sealing joints between EIFS and adjacent construction and <br />penetrations through EIFS. <br />1.3 SUBMITTALS <br />A. See Section 013000 - Administrative Requirements, for submittal procedures. <br />B. Product Data: Provide data on system materials, product characteristics, performance criteria, <br />and system limitations. <br />C. Shop Drawings: Indicate wall and soffit joint patterns, joint details, and molding profiles. <br />D. Selection Samples: Submit manufacturer's standard range of samples illustrating available <br />coating colors and textures. <br />1.4 QUALITY ASSURANCE <br />A. Maintain copy of specified installation standard and manufacturer's installation instructions at <br />project site during installation. <br />B. EIFS Manufacturer Qualifications: Provide EIFS products other than insulation from the same <br />manufacturer with qualifications as follows: <br />1. Member in good standing of EIMA (EIFS Industry Members Association). <br />2. Manufacturer of EIFS products for not less than 5 years. <br />C. Insulation Manufacturer Qualifications: Approved by manufacturer of EIFS and approved and <br />labeled under third parry quality program as required by applicable building code. <br />D. Installer Qualifications: Company specializing in the type of work specified and with at least <br />three years of documented experience. <br />1.5 MOCK-UP <br />A. Construct mock-up of typical EIFS application on specified substrate, size as indicated on <br />drawings, and including flashings, joints, and edge conditions. <br />B. Locate mock-up where directed. <br />EXTERIOR INSULATION AND 07 2400 - 1 <br />FINISH SYSTEMS <br />