My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 <br />South Bend, Indiana <br />1. Refer to drawings for details. <br />© Copyright, Kil Architecture / Planning <br />September 2020 <br />2.4 FABRICATION TOLERANCES <br />A. Squareness: 1/8 inch maximum difference in diagonal measurements. <br />B. Maximum Offset Between Faces: 1/16 inch. <br />C. Maximum Misalignment of Adjacent Members: 1/16 inch. <br />D. Maximum Bow: 1/8 inch in 48 inches. <br />E. Maximum Deviation From Plane: 1/16 inch in 48 inches. <br />PART 3 EXECUTION <br />3.1 EXAMINATION <br />A. Verify that field conditions are acceptable and are ready to receive work. <br />3.2 INSTALLATION <br />A. Install items plumb and level, accurately fitted, free from distortion or defects. <br />B. Provide for erection loads, and for sufficient temporary bracing to maintain true alignment until <br />completion of erection and installation of permanent attachments. <br />C. Obtain approval prior to site cutting or making adjustments not scheduled. <br />3.3 TOLERANCES <br />A. Maximum Variation From Plumb: 1/4 inch per story, non -cumulative. <br />B. Maximum Offset From True Alignment: 1/4 inch. <br />C. Maximum Out -of -Position: 1/4 inch. <br />END OF SECTION <br />METAL FABRICATIONS 05 5000 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.