My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 <br />South Bend, Indiana <br />© Copyright, Kil Architecture / Planning <br />September 2020 <br />1.6 SUBMITTALS <br />A. See Section 013000 - Administrative Requirements, for submittal procedures. <br />B. Product Data: Provide data on cleaning equipment & procedures. <br />1.7 QUALITY ASSURANCE <br />A. Comply with provisions of TMS 402/602, except where exceeded by requirements of Contract <br />Documents. <br />1.8 FIELD CONDITIONS <br />A. Cold and Hot Weather Requirements: Comply with requirements of TMS 402/602 or <br />applicable building code, whichever is more stringent. <br />PART 2 PRODUCTS <br />2.1 MORTAR MATERIALS <br />A. Comply with requirements of Section 04 0511. <br />2.2 SEALANT MATERIALS <br />A. Comply with requirements of Section 07 9200, Joint Sealants. <br />PART 3 EXECUTION <br />3.1 EXAMINATION <br />A. Verify that surfaces to be cleaned are ready for work of this section. <br />3.2 PREPARATION <br />A. Carefully remove and store removable items located in areas to be restored, including fixtures, <br />fittings, finish hardware, and accessories; reinstall upon completion. <br />B. Remove abandoned hardware, anchors, conduits and similar items from surface of masonry. <br />1. Identify all items to be removed and confirm status with Owner's mamenance staff. <br />2. Patch remaining holes of 3/8" width or less with latex sealant. <br />3. Patch remaing holes in exess of 3/8" width with mortar. <br />C. Separate areas to be protected from restoration areas using means adequate to prevent damage. <br />MAINTENANCE OF MASONRY 04 0100 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.