My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 © Copyright, Kil Architecture / Planning <br />South Bend, Indiana September 2020 <br />SECTION 04 0100 - MAINTENANCE OF MASONRY <br />PART 1 GENERAL <br />1.1 SECTION INCLUDES <br />A. Water cleaning of coated concrete block and concrete surfaces, including interior of upper roof <br />parapets. <br />B. Water cleaning of uncoated concrete unit masonry surfaces <br />C. Reinstallation of loose concrete block units. <br />D. Cutting of control joints in existing concrete masonry units. <br />E. Repointing mortar joints. <br />F. Sealing masonry control joints and settlement cracks. <br />G. Removal of abandoned hardware, anchors, conduits and similar items attached to the masonry <br />surfaces. <br />1.2 RELATED REQUIREMENTS <br />A. Section 04 0511 - Mortar and Masonry Grout. <br />B. Section 07 9200 - Joint Sealants. <br />C. Section 09 9723 - Concrete and Masonry Coatings. <br />1.3 PRICE AND PAYMENT PROCEDURES <br />A. See Section 01 2200 - Unit Prices, for additional unit price requirements. <br />B. Repointing: By the square foot. Includes areas indicated on drawings. <br />C. Sealant joints: By the linear foot. Includes joints indicated on drawings. <br />1.4 REFERENCE STANDARDS <br />A. TMS 402/602 - Building Code Requirements and Specification for Masonry Structures; 2016. <br />1.5 ADMINISTRATIVE REQUIREMENTS <br />A. Preinstallation Meeting: Convene one week prior to commencing work of this section. <br />1. Require attendance of parties directly affecting work of this section. <br />2. Review conditions of installation, installation procedures, and coordination with related <br />work. <br />MAINTENANCE OF MASONRY 04 0100 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.