Laserfiche WebLink
Liberty Tower Exterior Renovations - Ph 2 © Copyright, Kil Architecture / Planning <br />South Bend, Indiana September 2020 <br />1.10 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS <br />A. Remove temporary utilities, equipment, facilities, materials, prior to Date of Substantial <br />Completion inspection. <br />B. Remove underground installations to a minimum depth of 2 feet. Grade site as indicated. <br />C. Clean and repair damage caused by installation or use of temporary work. <br />D. Restore existing facilities used during construction to original condition. <br />E. Restore new permanent facilities used during construction to specified condition. <br />PART 2 PRODUCTS - Not Used <br />PART 3 EXECUTION - Not Used <br />END OF SECTION <br />TEMPORARY FACILITIES AND 01 5000 - 3 <br />CONTROLS <br />