My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 <br />South Bend, Indiana <br />© Copyright, Kil Architecture / Planning <br />September 2020 <br />SECTION 01 7000 - EXECUTION AND CLOSEOUT REQUIREMENTS <br />PART 1 GENERAL <br />1.1 SECTION INCLUDES <br />A. Examination, preparation, and general installation procedures. <br />B. Requirements for alterations work, including selective demolition. <br />C. Cutting and patching. <br />D. Cleaning and protection. <br />E. Closeout procedures, including Contractor's Correction Punch List, except payment procedures. <br />1.2 SUBMITTALS <br />A. See Section 013000 - Administrative Requirements, for submittal procedures. <br />B. Cutting and Patching: Submit written request in advance of cutting or alteration that affects: <br />1. Structural integrity of any element of Project. <br />2. Integrity of weather exposed or moisture resistant element. <br />3. Efficiency, maintenance, or safety of any operational element. <br />4. Visual qualities of sight exposed elements. <br />5. Work of Owner or separate Contractor. <br />1.3 QUALIFICATIONS <br />A. For surveying work, employ a land surveyor registered in the State in which the Project is <br />located and acceptable to Architect. Submit evidence of surveyor's Errors and Omissions <br />insurance coverage in the form of an Insurance Certificate. Employ only individual(s) trained <br />and experienced in collecting and recording accurate data relevant to ongoing construction <br />activities, <br />B. For field engineering, employ a professional engineer of the discipline required for specific <br />service on Project, licensed in the State in which the Project is located. Employ only <br />individual(s) trained and experienced in establishing and maintaining horizontal and vertical <br />control points necessary for laying out construction work on project of similar size, scope <br />and/or complexity. <br />1.4 COORDINATION <br />A. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to <br />ensure efficient and orderly sequence of installation of interdependent construction elements, <br />with provisions for accommodating items installed later. <br />B. Notify affected utility companies and comply with their requirements. <br />EXECUTION AND CLOSEOUT 01 7000 - 1 <br />REQUIREMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.