My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 <br />South Bend, Indiana <br />© Copyright, Kil Architecture / Planning <br />September 2020 <br />SECTION 01 5000 - TEMPORARY FACILITIES AND CONTROLS <br />PART 1 GENERAL <br />1.1 SECTION INCLUDES <br />A. Temporary sanitary facilities. <br />B. Temporary Controls: Barriers, enclosures, and fencing. <br />C. Security requirements. <br />D. Waste removal facilities and services. <br />E. Project identification sign. <br />F. Field offices. <br />1.2 TEMPORARY SANITARY FACILITIES <br />A. Provide and maintain required facilities and enclosures. Provide at time of project <br />mobilization. <br />B. Maintain daily in clean and sanitary condition. <br />1.3 BARRIERS <br />A. Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas <br />that could be hazardous to workers or the public and to protect existing facilities and adjacent <br />properties from damage from construction operations and demolition. <br />B. Provide barricades and covered walkways required by governing authorities for public <br />rights -of -way and for public access to existing building. <br />C. Provide protection for plants designated to remain. Replace damaged plants. <br />D. Protect non -owned vehicular traffic, stored materials, site, and structures from damage. <br />1.4 FENCING <br />A. Construction: Contractor's option. <br />B. Provide 6 foot high fence around construction site; equip with vehicular and pedestrian gates <br />with locks. <br />1.5 SECURITY - SEE SECTION 01 3553 <br />A. Provide security and facilities to protect Work, existing facilities, and Owner's operations from <br />unauthorized entry, vandalism, or theft. <br />TEMPORARY FACILITIES AND 01 5000 - 1 <br />CONTROLS <br />
The URL can be used to link to this page
Your browser does not support the video tag.