Laserfiche WebLink
Liberty Tower Exterior Renovations - Ph 2 <br />South Bend, Indiana <br />(G Copyright, Kil Architecture / Planning <br />September 2020 <br />1. Notations may be made directly on submitted items and/or listed on appended Submittal <br />Review cover sheet. <br />D. Architect's and consultants' actions on items submitted for review: <br />1. Authorizing purchasing, fabrication, delivery, and installation: <br />a. "Approved", or language with same legal meaning. <br />b. "Approved as Noted, Resubmission not required", or language with same legal <br />meaning. <br />1) At Contractor's option, submit corrected item, with review notations <br />acknowledged and incorporated. <br />C. "Approved as Noted, Resubmit for Record", or language with same legal meaning. <br />1) Resubmit corrected item, with review notations acknowledged and <br />incorporated. Resubmit separately, or as part of project record documents. <br />2. Not Authorizing fabrication, delivery, and installation: <br />a. "Revise and Resubmit". <br />1) Resubmit revised item, with review notations acknowledged and incorporated. <br />b. "Rejected". <br />1) Submit item complying with requirements of Contract Documents. <br />E. Architect's and consultants' actions on items submitted for information: <br />1. Items for which no action was taken: <br />a. "Received" - to notify the Contractor that the submittal has been received for <br />record only. <br />2. Items for which action was taken: <br />a. "Reviewed" - no further action is required from Contractor. <br />END OF SECTION <br />ADMINISTRATIVE 01 3000 - 6 <br />REQUIREMENTS <br />