My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:49:49 PM
Creation date
9/14/2020 4:47:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Fire Department <br />Two (2) Sealed LeverBanks - Cable Cntrls, AKR (EACH) <br />26-17-1050 <br />Thevalvecontrolshallbeasealedleverbanktypewithaircraftcablecontrol.Theleverbanks <br />shall be locking with a polished finish. They shall have a 6” stroke for ease of operation. <br />Theaircraftcablethatisusedtocontrolthevalvefromtheleverbankshallbefurnishedwith7/8” <br />bulkhead both ends, 5/16” threaded ends and will also require a 5/16” swivel u-joint that unhooks <br />from the ball valve. Thiscable will be usedforease of maintenance and operation. <br />Theleverbankbellcranksshallbeenclosedinanaluminumboxthatisattachedbelowthepump <br />operator’scontrol panel. <br />The aluminum box shall be weatherresistant so that dust is not allowed to enter the operatorarea <br />through the pump control panel. <br />Two (2) Gauge, Dschg, IC,2-1/2"400#, WF <br />27-02-1500 <br />Two (2) 2-1/2"IC discharge pressure gauges (0-400 PSI) shall be provided. The face of the <br />gauge shall be aWHITEdial with black letters. The gauges will be located on the pump <br />instrument panel. <br />One (1)Crosslay/Speedlay,Equipment Securement, NFPA <br />23-16-2900 <br />EQUIPMENT SECUREMENT <br />The hose bed openings shall be equipped with hose and nozzle securement devices to comply <br />with applicable NFPA standards. <br />Two (2) Dschg, 2-1/2", Rr CenterPumpPanel,Left Side,NST <br />23-20-2100 <br />REAR CENTER PUMP PANEL LEFT SIDE -- 2-1/2" DISCHARGE <br />Two (2) 2-1/2" discharge shall be installed on the left side of the rearcenterpump panel and <br />shall be controlled by a quarter turn ball valve on the rear mount pump control panel. The <br />discharge shall have 2-1/2" NPT x 2-1/2" NST male hose threads. An engraved nameplate label <br />shall be installed adjacent the valve control handle. <br />Two (2) Drain/Bleeder,IC Lift-Up, Mnl 1/4 Turn <br />21-01-2500 <br />AnInnovativeControls¾”castbronzequarter-turndrain/bleedervalveshallbeinstalled.The <br />valveshallbecompletewithachromeplatedbronzeball,reinforcedteflonseals,andblow-out <br />proofstemratedto600PSI.Achromeplatedzinchandleshallbeprovidedoneachdrainvalve <br />completewitharecessedIDlabelprovision.Thehandleshalllift,toopenandpushdown,to <br />close. <br />Two (2) Elbow, 2-1/2"Fx 2-1/2" NST M,Chrome <br />24-02-1200 <br />Two (2) chrome platedelbow with rocker lugs shall be provided with 2-1/2" NST swivel female <br />x 2-1/2" NST male hose threads. <br />10040-001909/02/20 <br />49 <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.