My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:49:49 PM
Creation date
9/14/2020 4:47:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Fire Department <br />Theleverbankbellcranksshallbeenclosedinanaluminumboxthatisattachedbelowthepump <br />operator’scontrol panel. <br />The aluminum box shall be weatherresistant so that dust is not allowed to enter the operatorarea <br />through the pump control panel. <br />One (1)Gauge, Dschg, IC,2-1/2"400#, WF <br />27-02-1500 <br />One (1) 2-1/2"IC discharge pressure gauges (0-400 PSI) shall be provided. The face of the <br />gauge shall be aWHITEdial with black letters. The gauges will be located on the pump <br />instrument panel. <br />One (1)SpeedlayDschgs,(2) 1-1/2",Front of Bdy, NST <br />23-16-1200 <br />FRONT OF BODY SPEEDLAYS -- 1-1/2" DISCHARGES <br />Two (2) 1-3/4" pre-connect hose speedlays shallbe installed at the front of body, controlled with <br />quarter turn 2" diameterball valves at the rear mount pump panel. The outlets shall be equipped <br />2" NPT female swivels x 1-1/2" male NST hose threads. <br />Each speedlay hosebed shall have smooth aluminum sides and slots integrated into the hosebed <br />floor. Each hosebed shall have a minimum capacity of 200 feet of 1-3/4"diameter double jacket <br />hose with hose and nozzle provided by fire department. <br />The hose bed openings shall be equipped with hose and nozzle securement devices to comply <br />with applicable NFPA standards. <br />Two (2) Drain/Bleeder,Class 1, Automatic - Spec Only <br />21-01-2202 <br />A Class 1 automatic type 3/4" bleeder valve shall be installed. <br />Two (2) Speedlay Rollers,"U"Shaped, Both Sides <br />23-16-4600 <br />ROLLERS FOR PRE-CONNECTED SPEEDLAY HOSE BED <br />The pre-connect speedlay hosebed shall be equipped stainless steel "U" shaped roller system, one <br />on eachend of the hosebed. <br />Two (2) Speedlay,1-3/4",Removable Hose Tray, Alum <br />23-16-8100 <br />SLIDE OUT TRAY FOR PRE-CONNECTEDHOSEBEDS <br />The 1-3/4" pre-connect hosebed(s) shall be equipped with a "U" shapedaluminum hose tray. <br />The unit shall be equipped with pull out hand holes and retaining devices to secure the tray, <br />nozzle, and hose in transit. <br />Two (2) VlvMfger,AKR,8000, (2") <br />24-61-1200 <br />The specified valve shallbe an Akron 8000 Seriestwo-inch (2") valve with a stainless ball. <br />10040-001909/02/20 <br />48 <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.