My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:49:49 PM
Creation date
9/14/2020 4:47:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Fire Department <br />Theminimumcontinuouselectricalloadshallbeactivatedwiththeenginerunningatidlespeed. <br />Theenginetemperatureshallbestabilizedatnormaloperatingtemperature.Thebatterysystem <br />shallbetestedtodetectthepresenceofbatterydischargecurrent.Thedetectionofbattery <br />dischargecurrent shall be considered a test failure. <br />3. Alternator performance test at full load: <br />Thetotalcontinuouselectricalloadshallbeactivatedwiththeenginerunninguptotheengine <br />manufacturer'sgovernedspeed.Thetestdurationshallbeaminimumoftwo(2)hours.Activation <br />oftheloadmanagementsystemispermittedduringthistest.However,ifanalarmsoundsdueto <br />excessivebatterydischarge,asdetectedbythesystemrequirementsintheNFPAstandards,ora <br />system voltage of less than 11.7 volts dc for more than 120 seconds is present, the test has failed. <br />4. Low voltage alarm test: <br />Followingthecompletionoftheabovetests,theengineshallbeshutoff.Thetotalcontinuous <br />electricalloadshallbeactivatedandshallcontinuetobeapplieduntiltheexcessivebattery <br />dischargealarmactivates.Thebatteryvoltageshallbemeasuredatthebatteryterminals.Withthe <br />loadstillapplied,areadingoflessthan11.7voltsdcfora12voltsystemshallbeconsideredatest <br />failure.Thebatterysystemshallthenbeabletorestarttheengine.Failuretorestarttheengineshall <br />be considered a test failure. <br />NFPA REQUIREDDOCUMENTATION <br />The following documentation shall be provided on delivery of theapparatus: <br />a. Documentation of theelectrical system performance tests requiredabove. <br />b. A written load analysis, including: <br />1. The nameplateratingof the alternator. <br />2. The alternator rating under the conditions. <br />3. Each specified component load. <br />4.Individual intermittent loads. <br />10040-001909/02/20 <br />25 <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.