My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:49:49 PM
Creation date
9/14/2020 4:47:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Fire Department <br />CommanderChassis <br />One (1)EngineExhaustWrap <br />06-08-0200 <br />ENGINE EXHAUSTWRAP <br />Theexhausttubingbetweentheengineturboandthedieselparticulatefilter(DPF)shallbe <br />wrappedwithathermalcoverinordertoretainthenecessaryheatforDPFregeneration.The <br />exhaustwrapshallalsohelpprotectsurroundingcomponentsfromradiantheatwhichcanbe <br />transferredfrom the exhaust. <br />One (1)DPF Control Regeneration Switch & InhibitSwitchCovered <br />08-02-0140 <br />DIESEL PARTICULATE FILTER CONTROLS <br />ProvideDPFsystemstatusannunciationindicatorlights,lightsshallbeinstalledondriver dash <br />to alert driver whenregeneration is needed and when DPF is in an activere-generation cycle. <br />Warning systems shall provide DEF low level warning. <br />Driver'sdashshallbeprovidedwithtwo(2)controlsfortheDieselparticulatefilter;one(1) <br />manualregenerationswitchtoactivatearegenerationcyclemanuallywhenpassiveburnis <br />unobtainable due to driving conditions; and one (1) Regen "Inhibit Switch". <br />The switches shall be located in a covered location. <br />One (1)Engine CoolingSystem-L9 <br />06-04-2002 <br />ENGINE COOLING SYSTEM <br />The radiatorand the complete cooling system shall meet or exceedNFPAand engine <br />manufacturer cooling system requirements. <br />The system shall includeand feature the following: <br />·A vertically stacked charge air cooler providing the maximum cooling capacity for the engine. <br />Proposals offering horizontally stacked charge aircooler shall not be acceptable. No Exceptions <br />·The charge aircoolerand radiator shall measurenot less than 1382 square inches <br />·A surge tank with a lowcoolant probe andcapable of removing entrainedair from the cooling <br />system, with built in sight glass <br />·Radiator re-circulation shields to prevent heated air from re-entering the cooling system and <br />affecting performance <br />10039-001609/02/20 <br />65 <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.