My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2020 8:48:51 AM
Creation date
8/26/2020 8:48:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTION 07920 <br /> <br />SEALANTS AND CAULKING <br /> <br />PART 1 - GENERAL <br />1.1 SUMMARY <br /> <br />A. Throughout the Work, seal and caulk joints where shown on the Drawings and <br />elsewhere as required to provide a positive barrier against passage of moisture <br />and passage of air. All joints are to be sealed and caulked whether specifically <br />identified in this Section or not. Appropriate materials shall be used for the <br />conditions being sealed. <br />1.2 SUBMITTALS <br /> <br />A. Manufacturer's specifications and other data needed to prove compliance with <br />the specified requirements. <br /> <br />B. Manufacturer's recommended installation procedures which, when approved by <br />the Architect/Engineer, will become the basis for accepting or rejecting actual <br />installation procedures used on the Work. <br /> <br />C. Samples: Accompanying the submittal described above, submit samples of each <br />sealant, each backing material, each primer, and each bond breaker proposed to <br />be used. Samples to include the following: <br />1. <br />2. Substrate test report for each sealer. <br />3. Certified Product test reports: Independent testing agency reports <br />showing compliance with all specified requirements. <br />a. Reports may be on tests conducted up to and including 24months <br />before submission, provided the tests were conducted using aged <br />specimens of the same products scheduled to be installed. <br />4. Field installation reports. <br />5. Certificates <br />a. <br />product complies with the Specifications and is appropriate for the <br />intended use. <br />6. <br />a. List all conditions detrimental to the performance of the scheduled <br />installation of joint sealer. <br /> <br /> <br />1.3 QUALITY ASSURANCE <br /> <br />A. Use adequate numbers of skilled workmen who are thoroughly trained and <br />experienced in the necessary crafts and who are completely familiar with the <br />specified requirements and the methods needed for proper performance of the <br />work of this Section. <br /> <br />SEALANTS AND CAULKING <br />07920-1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.