My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2020 8:48:51 AM
Creation date
8/26/2020 8:48:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.1 MEMBRANE <br /> <br />A. <br />perimeter, <br /> <br />B. Exposed decking shall be covered with two layers of No. 30 asphalt- <br />impregnated roofing felt. New roofing felt shall overlap existing a minimum of <br /> <br />2.2 FLASHING <br /> <br />A. Provide 20 oz. per square foot copper flashing for all valleys. Flashing shall <br />underlayment required in paragraph 2.1.B. <br /> <br />B. All pipe and vent penetrations shall have lead boots. <br /> <br />2.3 NAILS AND FASTENERS <br /> <br />A. Use only nails and fasteners approved by the manufacturer of the clay roofing <br />tiles used. <br /> <br />2.4 MORTAR <br /> <br />A. Provide a good grade mortar complying with recommendations of the <br />manufacturer of the clay roofing tiles used, and mixed with a suitable pigment <br />to produce a color matching the color of the approved roofing tiles. <br /> <br />2.5 ROOFING TILES <br /> <br />A. Provide Two-piece Italian Pan tiles and accessories to match existing. <br />1. Assume minimum 200 hip tiles for replacement. <br />2. Assume minimum 10 ridge tiles for replacement. <br />3. Assume 5 hip starters for replacement. <br />4. Assume minimum 20 eave closure pieces. <br />5. Field verify required field tile required for replacement before bids are <br />made to client. <br /> <br />2.6 CLEANER <br /> <br />A. Prosoco, Inc. EnviroKlean 2010 All Surface Cleaner. <br /> <br /> <br />2.7 OTHER MATERIALS <br /> <br />CLAY ROOFING TILES <br />07321-2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.