Laserfiche WebLink
REGULAR MEETING JULY 14, 2020 123 <br />AWARD BID AND APPROVE CONTRACT — COLFAX LIFT STATION IMPROVEMENTS <br />— PROJECT NO. 118-034C (REDA TIF) <br />Mr. Zach Hurst, Engineering, advised the Board that on June 9, 2020, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Hurst recommended <br />that the Board award the contract to the lowest responsive and responsible bidder, Selge <br />Construction Co., Inc., 2833 S. 11t'. St. Niles, MI 49120 in the amount of $459,103. Therefore, <br />Ms. Maradik made a motion that the recommendation be accepted, and the bid be awarded, and <br />the contract approved as outlined above. Mr. Molnar seconded the motion, which carried by roll <br />call. <br />AWARD QUOTATION AND APPROVE CONTRACT — MAIN & JEFFERSON SITE <br />IMPROVEMENTS - CONCRETE — PROJECT NO. 119-022A (RWDA TIF) <br />Mr. Zach Hurst, Engineering, advised the Board that on June 9, 2020, quotations were received <br />and opened for the above referenced project. After reviewing those quotations, Mr. Hurst <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />Weigand Construction Co., Inc., 7808 Honeywell Dr., Ft. Wayne, IN 46825, in the amount of <br />$74,146. Therefore, Ms. Maradik made a motion that the recommendation be accepted, and the <br />quotation be awarded, and the contract approved as outlined above. Mr. Molnar seconded the <br />motion, which carried by roll call. <br />AWARD QUOTATION AND APPROVE CONTRACT — WEST BANK TRAIL TIMBER <br />DEBRIS REMOVAL — PROJECT NO. 120-041 (PARK BOND TIF) <br />Mr. Zach Hurst, Engineering, advised the Board that on June 23, 2020, quotations were received <br />and opened for the above referenced project. After reviewing those quotations, Mr. Hurst <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />Ritschard Bros., Inc., 1204 W. Sample St., South Bend, IN, 46619, in the amount of $28,500. <br />Therefore, Ms. Maradik made a motion that the recommendation be accepted, and the quotation <br />be awarded, and the contract approved as outlined above. Mr. Molnar seconded the motion, <br />which carried by roll call. <br />APPROVE REQUEST TO REJECT BIDS— SEITZ PARK RECONSTRUCTION, PHASE I — <br />PROJECT NO. 117-093A (PARK BOND C, G, F, H AND REDA TIF) <br />In a memorandum to the Board, Ms. Sue Ellen Doudrick, Engineering, requested permission to <br />reject all bids for the above referenced project due to exceeding the budget. Therefore, upon a <br />motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the above <br />request was approved. <br />APPROVE CHANGE ORDER NO. 1 — WESTERN AVE. SEWER AND MANHOLE <br />REHABILITATION — PROJECT NO. 118-093 (UTILITY EXPENSE/CONTRACTUAL <br />SERVICE <br />Mr. Gilot advised that Ms. Sue Ellen Doudrick, Engineering, has submitted Change Order No. 1 <br />on behalf of Inland Waters Pollution Control, 4086 Michigan Ave., Detroit, MI 48210, indicating <br />the contract amount be increased by $70,378 for a new contract sum, including this Change <br />Order, in the amount of $3,194,654.50. Upon a motion made by Ms. Maradik, seconded by Mr. <br />Molnar and carried by roll call, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 2 — HURON ST. SEWER AND MANHOLE <br />REHABILITATION — PROJECT NO. 118-093 (UTILITY EXPENSE/CONTRACTUAL <br />SERVICE <br />Mr. Gilot advised that Ms. Sue Ellen Doudrick, Engineering, has submitted Change Order No. 2 <br />on behalf of Inland Waters Pollution Control, 4086 Michigan Ave., Detroit, MI 48210, indicating <br />the contract amount be increased by $24,725.10 for a new contract sum, including this Change <br />Order, in the amount of $3,219,379.60. Upon a motion made by Ms. Maradik, seconded by Mr. <br />Molnar and carried by roll call, the Change Order was approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — FIRE STATIONS NOS. 10 & 2 <br />PARKING LOT REPAIRS — PROJECT NO. 119-099 (CAPITAL IMPROVEMENTS <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46614, for the <br />above referenced project, indicating a final cost of $92,700. Upon a motion made by Ms. <br />Maradik, seconded by Mr. Molnar and carried by roll call, the Project Completion Affidavit was <br />approved. <br />