Laserfiche WebLink
previous studies and reports, operations reports and maintenance records, front end <br />specifications and design standards. <br />2.Prepare a basis of design memorandum <br />a.s, <br />assumptions and exclusions; <br />b.supply wells equipment condition assessment, electrical and controlsassessment <br />production capacity estimation and water quality summary; <br />c.filter condition assessment including filtration performance, underdrain system, filter <br />media, hydraulic control, valves, electric actuators,operational flexibility with respect <br />to treatment train isolationand associated controls; <br />d.high service pump equipment condition assessment including pumps, motors, variable <br />frequencydrives and controls; <br />e.electrical system summary including emergency backup power operational needs, <br />automatic transfer switch and associated controls; <br />f.rehabilitation/replacement options for the aforementioned supply and treatment <br />components available to Owner and, after consultation with Owner, recommendations <br />Owner <br />the Project; <br />g.schematic layouts, sketches, and conceptual design criteria with appropriate exhibits to <br />indicate the agreed-to requirements, considerations involved, and those alternate <br />solutions available to Owner which Engineer recommends; <br />h.list applicable codes and permitsand subsequentrequirements; <br />i.description of design approach to facility rehabilitation by each engineering design <br />discipline as required (utility coordination, survey, geotechnical investigation, civil/site, <br />structural, architectural, process, mechanical, plumbing, electrical and controls); and <br />j.Opinion of Probable Construction Costs (Association for the Advancement of Cost <br />Engineering,AACE class 4)for each recommended improvementas well as an estimate <br />of costs of design, professionalservices and allowances. <br />3.Furnish one electroniccopy of the Memo to Owner. <br />4.Conduct in-person review meeting with Owner. <br />B.Memo Review <br />1.Owner will provide feedback to Engineer on Memo within five (5) business days of review <br />meeting. <br />Page 2 <br />(Exhibit A <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />