Laserfiche WebLink
2.Engineer will incorporateOwner review comments and furnish the revised Memo to Owner <br />in electronic format within five (5) business days. <br />C.Basis of Design Memorandum Phasewill be consideredcomplete on <br />the date when the revised Memo has been delivered to Owner. <br />A1.03Preliminary Design Phase <br />A.After acceptance by Owner of the Memo, selection by Owner of a recommended solution and <br />indication of any specific modifications or changes in the scope, extent, character, or design <br />requirements of the Project desired by Owner, and upon written authorization from Owner, <br />Engineer shall: <br />1.Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications,and written descriptions of the Project. <br />a.Environmental and geotechnical investigations for design of a new Well 3 are not <br />included. <br />b.Electrical design for site power, well platform rework, new SCADA, new drives and <br />new motor are not included. <br />2.Provide necessary field surveys and topographic and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners. <br />3.Advise Owner if additional reports, data, information, or services of the types described in <br />ExhibitBare necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />4.Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised Opinion of Probable Construction Cost(AACE class 3), and assist Owner in <br />collating the various cost categories which comprise Total Project Costs. <br />5.Furnish one electronic review copyof the Preliminary Design Phase documents to Owner <br />and review them with Ownerduring in-person meeting. <br />6.Owner will provide any comments regarding the Preliminary Design Phase documents to <br />Engineer within five (5) business days of review meeting. <br />7. <br />comments, as appropriate, and furnish to Owner one electroniccopy of the revised <br />Preliminary Design Phase documents and revised opinion of probable Construction Cost, <br />within five (5) business days <br />Page 3 <br />(Exhibit A <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />