My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JUMPER STUDS <br />One (1) set of battery jumper studs with plastic color -coded covers will be included on the battery <br />compartments. <br />BATTERY CHARGER <br />There will be an IOTATA°, Model DSL 75, battery charger with IQ4, controller provided. <br />The battery charger will be wired to the AC shoreline inlet through an AC receptacle adjacent to this <br />battery charger. <br />There will be a KussmaulTM, Model #091-94-12, remote indicator included. <br />The battery charger will be located in the left body compartment mounted on the left wall as high as <br />possible. <br />The battery charger indicator will be located on the driver's seat riser. <br />AUTO EJECT FOR SHORELINE <br />There will be one (1) KussmaulTM, Model 091-55-20-120, 20 amp 120 volt AC shoreline inlet(s) <br />provided to operate the dedicated 120 volt AC circuits on the apparatus. <br />The shoreline inlet(s) will include red weatherproof flip up cover(s). <br />There will be a release solenoid wired to the vehicle's starter to eject the AC connector when the <br />engine is starting. <br />The shoreline(s) will be connected to the battery charger. <br />There will be a mating connector body supplied with the loose equipment. <br />There will be a label installed near the inlet(s) that state the following: <br />• Line Voltage <br />• Current Ratting (amps) <br />• Phase <br />• Frequency <br />The shoreline receptacle will be located on the driver side of cab, above wheel. <br />ALTERNATOR <br />There will be a C.E Niehoff, Model C531 or C537 alternator provided. It will have a rated output current <br />of 360 amps, as measured by SAE method J56. It will have a custom three (3)-set point voltage <br />regulator, manufactured by C. E. Niehoff. The alternator will be connected to the power and ground <br />distribution system with heavy-duty cables sized to carry the full rated alternator output. <br />ELECTRONIC LOAD MANAGER <br />An electronic load management (ELM) system will be provided that monitors the vehicles 12-volt <br />electrical system, automatically reducing the electrical load in the event of a low voltage condition, and <br />49 of 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.