My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cab/Crew Auxiliary Heater <br />There will be one (1) 31,000 BTU auxiliary heater with 560 SCFM of airflow provided in each outboard <br />rear facing seat risers with a dual scroll blower. An aluminum plenum incorporated into the cab <br />structure used to transfer heat to the forward positions. <br />Air Conditionina <br />A condenser will be a 59,644 BTU output that meets and exceeds the performance specification will be <br />mounted on the radiator. <br />The air conditioning system will be capable of cooling the average cab temperature from 100 degrees <br />Fahrenheit to 75 degrees Fahrenheit at 50 percent relative humidity within 30 minutes. The cooling <br />performance test will be run only after the cab has been heat soaked at 100 degrees Fahrenheit for a <br />minimum of 4 hours. <br />The evaporator unit will be installed in the rear portion of the cab ceiling over the engine tunnel. The <br />evaporator will include one (1) high performance heating core, one (1) high performance cooling core <br />with (1) plenum directed to the front and one (1) plenum directed to the rear of the cab. <br />The evaporator unit will have a 52,000 BTU at 690 SCFM rating that meets and exceeds the <br />performance specifications. <br />Adjustable air outlets will be strategically located on the forward plenum cover per the following: <br />• Four (4) will be directed towards the seating position on the left side of the cab <br />• Four (4) will be directed towards the seating position on the right side of the cab <br />Adjustable air outlets will be strategically located on the evaporator cover per the following: <br />• Five (5) will be directed towards crew cab area <br />A high efficiency particulate air (HEPA) filter will be included for the system. Access to the filter cover <br />will be secured with four (4) screws. <br />The air conditioner refrigerant will be R-134A and will be installed by a certified technician. <br />Climate Control <br />An automotive style controller will be provided to control the heat and air conditioning system within the <br />cab. The controller will have three (3) functional knobs for fan speed, temperature, and air flow <br />distribution (front to rear) control. <br />The system will control the temperature of the cab and crew cab automatically by pushing the center of <br />the fan speed control knob. Rotate the center temperature control knob to set the cab and crew cab <br />temperature. <br />The AC system will be manually activated by pushing the center of the temperature control knob. <br />Pushing the center of the air flow distribution knob will engage the AC for max defrost, setting the fan <br />speeds to 100 percent and directing all air flow to the overhead forward position. <br />24 of 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.