My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The forward cab and crew cab doors will be constructed of extruded aluminum with a nominal material <br />thickness of 0.093". The exterior door skins will be constructed from 0.090" aluminum. <br />A customized, vertical, pull -down type door handle will be provided on the exterior of each cab door. <br />The exterior handle will be designed specifically for the fire service to prevent accidental activation, and <br />will provide 4.00" wide x 2.00" deep hand clearance for ease of use with heavy gloved hands. <br />Each door will also be provided with an interior flush, open style paddle handle that will be readily <br />operable from fore and aft positions, and be designed to prevent accidental activation. The interior <br />handles will provide 4.00" wide x 1.25" deep hand clearance for ease of use with heavy gloved hands. <br />The cab doors will be provided with both interior (rotary knob) and exterior (keyed) locks exceeding <br />FMVSS standards. The keys will be Model 751. The locks will be capable of activating when the doors <br />are open or closed. The doors will remain locked if locks are activated when the doors are opened, <br />then closed. <br />A full length, heavy duty, stainless steel, piano -type hinge with a 0.38" pin and 11 gauge leaf will be <br />provided on all cab doors. There will be double automotive -type rubber seals around the perimeter of <br />the door framing and door edges to ensure a weather -tight fit. <br />A chrome grab handle will be provided on the inside of each cab door for ease of entry. <br />A red webbed grab handle will be installed on the crew cab door stop strap. The grab handles will be <br />securely mounted. <br />The cab steps at each cab door location will be located inside the cab doors to protect the steps from <br />weather elements. <br />Door Panels <br />The inner cab door panels will be constructed out of brushed stainless steel. <br />MANUAL CAB DOOR WINDOWS <br />All cab entry doors will contain a conventional roll down window. <br />ELECTRIC CAB DOOR LOCKS <br />The front driver and officer doors will have a door lock master switch that will control all front and rear <br />crew cab door locks. Each rear crew cab door will have its own lock control. <br />There will be one (1) concealed switch located in an easily accessible chassis specific location that will <br />unlock all the doors. <br />CAB STEPS <br />The forward cab and crew cab access steps will be a full size two (2) step design to provide largest <br />possible stepping surfaces for safe ingress and egress. The bottom steps will be designed with a grip <br />pattern punched into bright aluminum treadplate material to provide support, slip resistance, and <br />drainage. The bottom steps will be a bolt -in design to minimize repair costs should they need to be <br />replaced. The forward cab steps will be a minimum 25.00" wide, and the crew cab steps will be 21.65" <br />wide with a 10.00" minimum depth. The inside cab steps will not exceed 16.50" in height. <br />21 of 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.