My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Shields or baffles will be provided to prevent recirculation of hot air to the inlet side of the radiator. <br />COOLANT LINES <br />Gates, or Goodyear, rubber hose will be used for all engine coolant lines installed by Pierce <br />Manufacturing. <br />Hose clamps will be stainless steel constant torque type to prevent coolant leakage. They will expand <br />and contract according to coolant system temperature thereby keeping a constant clamping pressure <br />on the hose. <br />FUEL TANK <br />A 65 gallon fuel tank will be provided and mounted at the rear of the chassis. The tank will be <br />constructed of stainless steel. It will be equipped with swash partitions and a vent. The exterior of the <br />tank will be unpainted. To reduce the effects of corrosion, the fuel tank will be mounted with stainless <br />steel straps. <br />A 0.75" drain plug will be provided in a low point of the tank for drainage. <br />A fill inlet will be located on the left hand side of the body and be covered with a hinged, spring loaded, <br />stainless steel door that is marked "Ultra Low Sulfur - Diesel Fuel Only". <br />A 0.50" diameter vent will be provided running from top of tank to just below fuel fill inlet. <br />The tank will meet all FHWA 393.67 requirements, including a fill capacity of 95 percent of tank volume. <br />All fuel lines will be provided as recommended by the engine manufacturer. <br />DIESEL EXHAUST FLUID TANK <br />A 4.5 gallon diesel exhaust fluid (DEF) tank will be provided and mounted in the driver's side body <br />forward of the rear axle. <br />A 0.50" drain plug will be provided in a low point of the tank for drainage. <br />A fill inlet will be located on the driver's side of the body and be covered with a hinged, spring loaded, <br />polished stainless steel door that is marked "Diesel Exhaust Fluid Only". <br />The tank will meet the engine manufacturers requirement for 10 percent expansion space in the event <br />of tank freezing. <br />The tank will include an integrated heater unit that utilizes engine coolant to thaw the DEF in the event <br />of freezing. <br />FUEL SHUTOFF <br />A shutoff valve will be installed in the fuel line, on both sides of the fuel filter. <br />TRANSMISSION <br />An Allison 5th generation, Model EVS 3000P, electronic torque converting automatic transmission will <br />be provided. <br />14 of 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.