BID/PROPOSALS
<br />rrr fir,
<br />CITY OF SOUTH
<br />BEND
<br />0� ►,,
<br />Project
<br />Name: Seitz Park Reconstruction Phase
<br />1
<br />Project
<br />...
<br />Number: 117-093A
<br />. ................
<br />:
<br />For
<br />Bids Due: June 9, 2020
<br />w 180
<br />Contractor
<br />Name: Northern Indiana Construction
<br />Company Inc.
<br />....
<br />Concrete Topping Slab, Integral Color,
<br />_.._.
<br />...........
<br />A-28
<br />Finish "B"
<br />279
<br />SYS
<br />135.00
<br />-
<br />37,665.00
<br />........................
<br />A-29
<br />Sheet Pile NZ14
<br />..__ ......
<br />42
<br />TON
<br />2,100.00
<br />8 200 00
<br />A-30
<br />Threaded Tie Rod
<br />5
<br />EACH
<br />2,000.00
<br />10,000.00
<br />A-31
<br />Wales - Double C
<br />130
<br />LFT
<br />. .....
<br />125.00
<br />..........
<br />16 250.00
<br />A-32
<br />Sheet Pile Concrete Cap
<br />65
<br />LFT
<br />555.00
<br />36,075.00
<br />A-33
<br />Subgrade Treatment, Type III
<br />420
<br />SYS
<br />5.75
<br />2,415.00
<br />A-34
<br />Compacted Aggregate, No. 53
<br />90
<br />TON
<br />90.00
<br />8,100.00
<br />mmITITm
<br />A-35
<br />Sidewalk,. 6-in
<br />116
<br />SYS
<br />86.00
<br />9,976 00
<br />A-36
<br />Straight Curb
<br />84
<br />1 LFT
<br />46.00
<br />3,864.00
<br />A-37
<br />Concrete Walk False Joints
<br />366
<br />1 LFT
<br />13.50
<br />4,941.00
<br />A-38
<br />Sidewalk6-in, Integral Color, Finish "A"
<br />137
<br />SYS
<br />175.00
<br />23,975.00,
<br />A-39
<br />Sidewalk, 6-in, Integral Color, Finish "B"
<br />._.._
<br />24
<br />SYS
<br />_
<br />225.00
<br />_ ...........
<br />5,400M
<br />A-40
<br />Expansion Joint, Concrete Walk
<br />301
<br />LFT
<br />15.50
<br />4,665.50
<br />A-41
<br />Sidewalk Joint Transitions
<br />154
<br />LFT
<br />23.00
<br />3,542.00
<br />A-42
<br />Unit Paver
<br />66
<br />SYS
<br />175.00
<br />11,550.00
<br />A-43
<br />Litter Receptacle
<br />1
<br />EACH
<br />1,620.00
<br />1,620.00
<br />A-44
<br />Rec clin Receptacle
<br />1
<br />EACH
<br />1,620.00
<br />1,620.00
<br />A-45
<br />Bench
<br />6
<br />EACH
<br />1,500.00
<br />9,000.00
<br />A-46
<br />Tree Grate
<br />1
<br />EACH
<br />2,450.00
<br />2,450.00
<br />Type5 Rail with Custom Infill Panel, 42
<br />40
<br />LFT
<br />A-47
<br />in
<br />350.00
<br />14,00 0.00
<br />Type 5 Rail with Custom Infill Panel, 48
<br />188
<br />LFT
<br />370.00
<br />mmmmITITITITITmm
<br />69,560 00
<br />A-48
<br />inch
<br />........ ._
<br />Type 5 Rail with Custom Infill Panel,
<br />_....__.....
<br />168
<br />LFT
<br />A-49
<br />Custom Curved, 48 inch
<br />386.00
<br />64,848.00
<br />A-50
<br />Handrail
<br />20
<br />LFT
<br />195.00
<br />3,900.00
<br />A-51
<br />._. ....
<br />Lighting, , Pole, 10 ft
<br />..... .. ........
<br />6
<br />EACH
<br />3,360.00
<br />20,160.00
<br />A-52
<br />Foundation, _gg hting_
<br />6
<br />EACH
<br />800.00
<br />4,800.00
<br />A-53
<br />Luminaire, T e L1
<br />6
<br />EACH
<br />3,350.00
<br />20,100.00
<br />A-54
<br />Luminaire, T e L13
<br />7
<br />EACH
<br />1,154.00
<br />8,078.00
<br />A-55
<br />Handhole, Lightingm ..___..
<br />2
<br />EACH
<br />650.00
<br />.......
<br />..... 1,300.00
<br />A-56
<br />Schedule 80 HDPE, 1.5 inch
<br />200
<br />LFT
<br />6.20
<br />-_-
<br />1,240.00
<br />A-57
<br />Schedule 80 HDPE, 2 inch
<br />370
<br />LFT
<br />6.60
<br />2,442.00
<br />Version 4/2/2019 Contractor's Bid for Public Works - 8
<br />
|