Laserfiche WebLink
BID/PROPOSAL <br />ws-J, J,,�� <br />CITY OF SOUTH BEND <br />Project Name: Seitz Park Reconstruction Phase <br />1ILI <br />.......... __.ITUT <br />Project Number: 117-093A <br />_.... <br />e <br />For Bids Due: June 9, 2020 <br />" <br />Contractor Name: n Com a� y. Inc IT <br />�o Northern Indiana Constructi <br />A-58 <br />Service Point <br />1 <br />EFCH <br />8,500.00 <br />8,500.00 <br />A-59 <br />.._._._..._ <br />Wire, 3#8, No 10 AWG, Solid Copper <br />370 <br />L <br />2.80 <br />ITITIT���mm-2 <br />1,036.00 <br />Wire, 2#12 No 12AWG Solid Co er <br />200 <br />LFT <br />............. <br />00 <br />—...m._ <br />Mobilization and Demobilization for <br />FEACH <br />400.00 <br />A-61 <br />Seeding2 <br />800.00 <br />A-62 <br />Topsoil <br />4 <br />CYS <br />147.00 <br />588.00 <br />A-63 <br />Sodding, Nursery <br />33 <br />SYS <br />72.55 <br />2,394.15 <br />A-64 <br />Excelsoir Blanket <br />470 <br />SYS <br />4.86 <br />2,284.20 <br />A-65 <br />.............................._ <br />Shredded Hardwood Mulch <br />. <br />27 <br />CYS <br />95.00 <br />2,565.00 <br />....... ............. <br />A-66 <br />Deciduous Tree, 2.5 inch caliper_ __..- <br />9 <br />EACH <br />575,00 <br />5,175.00 <br />A-67 _. <br />Coniferous Shrubs, No. 3 Cont <br />73 <br />EACH <br />54.00 <br />3,942.00 <br />A_-68 <br />_A-69.........Pe.fe.n.n.la.1.S.'...No......1...Cont.................... <br />Shrubs, No. 3 Cont. <br />284 <br />EACH <br />-......................................1.7.00 <br />54.00 <br />15,336.00 <br />336 <br />EACH <br />5,712.00.. <br />A-70 <br />Ornamental Grasses, No. 1 Cont. <br />116 <br />EACH <br />17.00 <br />1,972.00 <br />A-71 <br />Groundcover, No. 1 Cont. <br />40 <br />EACH <br />17.00 <br />680.00 <br />A-72 <br />Planting Mixture <br />_n <br />160 <br />..................................................._ <br />CYS <br />_ ...... <br />135.00 <br />21,600.00 <br />A-73 <br />Metal Edging <br />170 <br />LFT <br />11.35 <br />1,929.50 <br />A-74 <br />Irrigation System <br />9 Y <br />1 <br />LSUM <br />27,500.00 <br />27,500.00 <br />DVISION A TOTAL <br />2,266,923.37 <br />DIVISION <br />B - BASE BID <br />Item <br />No. <br />....... ......-..-...-.._._ <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />B-1 <br />Remediation Allowance <br />1 <br />LSUM <br />$5,000.00 <br />$5,000.00 <br />B-2 <br />Permit Compliance Administration <br />1 <br />LSUM <br />4,485.00 <br />4,485.00 <br />B-3 <br />Mobilization and Demobilization <br />1 <br />LSUM <br />38,375.00 <br />38,375.00 <br />B-4 <br />Construction En ineenn <br />onstr .___-- <br />1 <br />LSUM. <br />1 0 <br />0,150.0 <br />10,15 0.00 <br />B-5 <br />Video Record <br />1 <br />LSUM <br />500.00 <br />500.00 <br />Temporary Erosion and Sediment <br />1 <br />LSUM <br />B-6 <br />Control <br />2,500.00 <br />2 500.00 <br />B-7 <br />Clearing, Right of Way <br />1 <br />LSUM <br />19,470.00 <br />19,470 00 <br />B-8 <br />Sidewalk, Concrete, Removal <br />58 <br />SYS <br />25.00 <br />1,450.00 <br />B 9__- <br />Gabions, Remove and Salvage <br />108 <br />CYS <br />75.00 <br />8,100.00 <br />B-10 <br />Excavation, Common <br />265 <br />CYS <br />60.00 <br />15,900.00 <br />Version 4/2/2019 Contractor's Bid for Public Works - 9 <br />