BID/PROPOSAL
<br />ws-J, J,,��
<br />CITY OF SOUTH BEND
<br />Project Name: Seitz Park Reconstruction Phase
<br />1ILI
<br />.......... __.ITUT
<br />Project Number: 117-093A
<br />_....
<br />e
<br />For Bids Due: June 9, 2020
<br />"
<br />Contractor Name: n Com a� y. Inc IT
<br />�o Northern Indiana Constructi
<br />A-58
<br />Service Point
<br />1
<br />EFCH
<br />8,500.00
<br />8,500.00
<br />A-59
<br />.._._._..._
<br />Wire, 3#8, No 10 AWG, Solid Copper
<br />370
<br />L
<br />2.80
<br />ITITIT���mm-2
<br />1,036.00
<br />Wire, 2#12 No 12AWG Solid Co er
<br />200
<br />LFT
<br />.............
<br />00
<br />—...m._
<br />Mobilization and Demobilization for
<br />FEACH
<br />400.00
<br />A-61
<br />Seeding2
<br />800.00
<br />A-62
<br />Topsoil
<br />4
<br />CYS
<br />147.00
<br />588.00
<br />A-63
<br />Sodding, Nursery
<br />33
<br />SYS
<br />72.55
<br />2,394.15
<br />A-64
<br />Excelsoir Blanket
<br />470
<br />SYS
<br />4.86
<br />2,284.20
<br />A-65
<br />.............................._
<br />Shredded Hardwood Mulch
<br />.
<br />27
<br />CYS
<br />95.00
<br />2,565.00
<br />....... .............
<br />A-66
<br />Deciduous Tree, 2.5 inch caliper_ __..-
<br />9
<br />EACH
<br />575,00
<br />5,175.00
<br />A-67 _.
<br />Coniferous Shrubs, No. 3 Cont
<br />73
<br />EACH
<br />54.00
<br />3,942.00
<br />A_-68
<br />_A-69.........Pe.fe.n.n.la.1.S.'...No......1...Cont....................
<br />Shrubs, No. 3 Cont.
<br />284
<br />EACH
<br />-......................................1.7.00
<br />54.00
<br />15,336.00
<br />336
<br />EACH
<br />5,712.00..
<br />A-70
<br />Ornamental Grasses, No. 1 Cont.
<br />116
<br />EACH
<br />17.00
<br />1,972.00
<br />A-71
<br />Groundcover, No. 1 Cont.
<br />40
<br />EACH
<br />17.00
<br />680.00
<br />A-72
<br />Planting Mixture
<br />_n
<br />160
<br />..................................................._
<br />CYS
<br />_ ......
<br />135.00
<br />21,600.00
<br />A-73
<br />Metal Edging
<br />170
<br />LFT
<br />11.35
<br />1,929.50
<br />A-74
<br />Irrigation System
<br />9 Y
<br />1
<br />LSUM
<br />27,500.00
<br />27,500.00
<br />DVISION A TOTAL
<br />2,266,923.37
<br />DIVISION
<br />B - BASE BID
<br />Item
<br />No.
<br />....... ......-..-...-.._._
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />B-1
<br />Remediation Allowance
<br />1
<br />LSUM
<br />$5,000.00
<br />$5,000.00
<br />B-2
<br />Permit Compliance Administration
<br />1
<br />LSUM
<br />4,485.00
<br />4,485.00
<br />B-3
<br />Mobilization and Demobilization
<br />1
<br />LSUM
<br />38,375.00
<br />38,375.00
<br />B-4
<br />Construction En ineenn
<br />onstr .___--
<br />1
<br />LSUM.
<br />1 0
<br />0,150.0
<br />10,15 0.00
<br />B-5
<br />Video Record
<br />1
<br />LSUM
<br />500.00
<br />500.00
<br />Temporary Erosion and Sediment
<br />1
<br />LSUM
<br />B-6
<br />Control
<br />2,500.00
<br />2 500.00
<br />B-7
<br />Clearing, Right of Way
<br />1
<br />LSUM
<br />19,470.00
<br />19,470 00
<br />B-8
<br />Sidewalk, Concrete, Removal
<br />58
<br />SYS
<br />25.00
<br />1,450.00
<br />B 9__-
<br />Gabions, Remove and Salvage
<br />108
<br />CYS
<br />75.00
<br />8,100.00
<br />B-10
<br />Excavation, Common
<br />265
<br />CYS
<br />60.00
<br />15,900.00
<br />Version 4/2/2019 Contractor's Bid for Public Works - 9
<br />
|