Laserfiche WebLink
BID/PROPOSAL iptj ,,ra <br />CITY OF SOUTH BENDq <br />Project Name: Seitz Park Reconstruction Phase 1 <br />Project Number: 117-093A <br />For Bids Due: June 9, 2020 <br />... Northern Indiana Construction�m...... �.w.�_��_............................................�_ ���.�........_�����... <br />Contractor Name: Company Inc .ITITITIT_.............................___......... <br />DIVISION <br />A - BASE BID <br />Item <br />No. <br />Description <br />Quantitym <br />Unit <br />----- — -------- <br />Unit Price <br />. . <br />Total Amount <br />.. . _........................................................ <br />A-1 <br />Remediation Allowance_ <br />1 <br />LSUM <br />$10 000 00 <br />$10,000.00 <br />Maintenance of Traffic <br />1 <br />LSUM <br />10,165.70 <br />10,165.70 <br />A-3 <br />Permit Compliance Administration <br />1 <br />LSUM <br />25,000.00 <br />25,000.00 <br />A-4 <br />Mobilization and Demobilization <br />1 <br />LSUM <br />120,000.00 <br />120,000.00 <br />A-5 <br />Construction Engineering <br />1 <br />LSUM <br />80,000.00 <br />80,000.00 <br />A-6 <br />Video Record <br />1 <br />LSUM <br />2,000.00 <br />2,000.00 <br />Temporary Erosion and Sediment <br />1 <br />LSUM <br />A-7 <br />Control <br />24,152.07 <br />24,152.07 <br />A-8 <br />Temporary Drop Inlet Protection <br />1 <br />EACH <br />340.00 <br />. ...... ®. ... _.._ <br />340.00 <br />..... <br />A-g <br />Construction Access Drive <br />1 <br />EACH <br />5,820.00 <br />5,820.00 <br />A-10 <br />................._.................... _ .................. <br />Clearin Ri ht of Way <br />1 <br />LSUM <br />163,554.00 <br />163,554.00 <br />A-11 <br />Sidewalk, Concrete, Removal <br />609 <br />............. _ ........_ <br />SYS <br />............. <br />25.00 <br />_. ...__.. <br />15,225.00 <br />............. <br />A-12 <br />Wall, Concrete, Removal <br />150 <br />LFT <br />450.00 <br />67,500.00 <br />A-13 <br />Wall, Concrete, Partial Removal <br />225 <br />LFT <br />- .............................._ <br />75.00 <br />....... ..... <br />16,875.00 <br />A-14 <br />Gabions, Remove and Salva a <br />190 <br />CYS <br />55.00 <br />10,450.00 <br />A-15 <br />..... <br />hti L N_Structure, Removal _ <br />4 <br />EACH <br />400.00 <br />1,600.00 <br />A-16 <br />Excavation, Common <br />2172 <br />CYS <br />60„00 <br />130,320.00 <br />A-17 <br />Borrow, B <br />1968 <br />CYS <br />55.00 <br />108,240.00 <br />A-18 <br />Structural Backfill, Type 4 <br />315 <br />CYS <br />150.00 <br />47,250.00 <br />A-19 <br />Geofoam Lightweight Fill <br />750 <br />CYS <br />140.00 <br />105,000.00 <br />A-20 <br />I Pipe, Type 4, 6 in <br />325 <br />LFT <br />9.65 <br />3,136.25 <br />A-21 <br />Aggregates for Underdrains <br />12 <br />CYS <br />300.00 <br />3,600.00 <br />A-22 <br />Pneumatically Placed Mortar <br />85 <br />SFT <br />55.00 <br />4,675.00 <br />A-23 <br />Salvaged Gabion Material, Install <br />1 298 <br />CYS <br />1 60.00 <br />17,880.00 <br />A-24 <br />Concrete, C, Superstructure <br />289 <br />CYS <br />850.00 <br />245,650.00 <br />T <br />A-25 ........... <br />Concrete, B, Footings <br />. ....... ........... ......... <br />556 <br />CYS <br />700.00 <br />389,200.00 <br />A-26 <br />Concrete, A, Planter Wall <br />12 <br />CYS <br />1,300.00 <br />15,600.00 <br />Concrete Topping Slab, Integral Color, <br />330 <br />SYS <br />150.00 <br />49,500.00 <br />Finish "A" <br />A 27 <br />Version 4/2/2019 Contractor's Bid for Public Works - 7 <br />