My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the pump operator's panel. The valve operating mechanism shall indicate the position of the <br />valve. <br />If a handwheel control valve is used, the control shall be a minimum of a 3.9" diameter <br />chrome plated handwheel with a dial position indicator built in to the center of the <br />handwheel. <br />UGE RISER <br />3.00" deluge riser shall be installed above the pump in such a manner that a monitor can be <br />punted and used effectively. Piping shall be installed securely so no movement develops <br />ten the line is charged. The riser shall be gated and controlled at the pump operator's panel. <br />W WATER LEVEL ALARM <br />audible alarm shall be included that shall sound when the water level drops below one <br />ith of a tank. <br />CODING <br />ch discharge valve control, outlet, and corresponding gauge shall be color -coded. The <br />lor-coding shall be: <br />1 Discharge — To be determined in pre -build <br />2 Discharge — To be determined in pre -build <br />3 Discharge (Where applicable) — To be determined in pre -build <br />4 Discharge (Where applicable) - To be determined in pre -build <br />5 Discharge (Where applicable) - To be determined in pre build YES O <br />1 Speedlay Pre -Connect -To be determined in pre -build <br />2 Speedlay Pre -Connect - To be determined in pre -build <br />ront Bumper Line - To be determined in pre -build <br />arge Diameter Discharge — To be determined in pre -build <br />eft Hose Bed Pre -Connect - To be determined in pre -build <br />ight Hose Bed Pre -Connect - To be determined in pre -build <br />eft Rear Discharge - To be determined in pre -build ES O <br />ight Rear Discharge — To be determined in pre -build <br />leck Gun — To be determined in pre -build <br />filets — To be determined in pre -build <br />ank fill - To be determined in pre -build <br />ank to Pump — To be determined in pre -build <br />ELESCOPIC PIPING <br />The deluge riser piping shall include an 18.00" Task Force Model XG 18 Extend -A -Gun <br />extension. <br />This extension shall be telescopic to allow the deluge gun to be raised 18.00" increasing the <br />range of operation. <br />A position sensor shall be provided on the telescopic piping that shall activate the "do not <br />move vehicle" light inside the cab when the monitor is in the raised position. <br />A task force tips model monitor shall be properly installed on the deluge riser. <br />This monitor shall include both a fixed base and a portable base with a 5.00" Storz inlet. <br />The monitor shall be painted to match the body. <br />m <br />
The URL can be used to link to this page
Your browser does not support the video tag.