My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
March 2017
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2017
>
March 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:21 PM
Creation date
6/8/2020 10:18:15 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001364
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. Comply with Division 1 requirements. <br />B. Product Data: Submit manufacturer's product data, including installation instructions. <br />Specifier Notes: Delete the following sentence if shop drawings are not required. <br />C. Shop Drawings: Submit manufacturer's shop drawings, indicating dimensions, construction, <br />component connections and locations, anchorage methods and locations, hardware locations, <br />and installation details. <br />Specifier Notes: Delete the following sentence if samples are not required. <br />D. Samples: Submit full-size or partial full-size sample of vinyl sliding windows illustrating glazing <br />system, quality of construction, and color of finish. <br />E. Warranty: Submit manufacturer's standard warranty. <br />1.6 QUALITY ASSURANCE <br />Specifier Notes: Edit the following paragraph as required for inclusion of field testing. <br />A. Mockup: <br />1. Provide sample installation for field testing window performance requirements and to <br />determine acceptability of window installation methods. <br />2. Approved mockup shall represent minimum quality required for the Work. <br />Specifier Notes: Edit the following sentence as required for inclusion of the mockup. <br />3. Approved mockup shall [not] remain in place within the Work. <br />1.7 DELIVERY, STORAGE, AND HANDLING <br />A. Delivery: Deliver materials to site undamaged in manufacturer's or sales branch's original, <br />unopened containers and packaging, with labels clearly identifying manufacturer and product <br />name. Include installation instructions. <br />B. Storage: <br />1. Store materials in accordance with manufacturer's instructions. <br />2. Store materials off ground and under cover. <br />3. Protect materials from weather, direct sunlight, and construction activities. <br />C. Handling: Protect materials and finish during handling and installation to prevent damage. <br />PART PRODUCTS <br />2.1 MANUFACTURER <br />ThermaStar by Pella® Vinyl Sliding Windows (East) <br />08562 (08 53 13) - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.