Laserfiche WebLink
10 February Elicia and I met with Shane Fimbel and Kevin Smith of Global Access <br />and Union Station about their vision and future plans centering around Union Station. E- <br />mailed Bob Yapp for leads on Brick Street experts. Finished looking up the homeowners <br />for West LaSalle. Drafted a letter for sending to the homeowners. Requested that Steve <br />Szaday follow up on a report of a hole in the roof at 417 E. Navarre in Chapin Park. The <br />roof isn't the problem and Steve sent over pictures to Code showing broken windows in <br />the rear and tarps on the rear fagade. <br />13 February Responded to Linda Martin on the Board of Public Works request for HPC <br />to give opinion on the awnings and canopy on the All American Trust Building. Brad <br />Toothaker is requesting height variances for the awnings and the canopies. This is a <br />National Register Property, so our permission or approval isn't even necessary. <br />However, I responded: The entrance canopies look appropriate to the building and its <br />use as a restaurant. I think that the window awnings detract from the windows and the <br />neo classical style of the building. But if the owners feel that these are their only <br />practical option, it won't be the end of the world since they can be safely removed since <br />they will be installed in the mortar joints. I attended and participated the Finance <br />Committee meeting of the Northern Indiana Center for History, went over December and <br />January numbers, 2012budget and upcoming audit. Proof read HPC Newsletter. Acted <br />upon a letter from Thomas Keller, President of the East Wayne Street Neighborhood <br />Association requesting action on the mismatched entry gate light. Marcia Qualls, <br />Engineering and I worked out that HPC will order the lantern, take delivery of the <br />lantern, EWSNS will be billed for the cost and Engineering will see that it is installed. <br />Met with Linda Riley again on this issue. Followed up with IVYTech student on <br />marketing internship. <br />14 February Spoke with Royce Baier of Royce Restorations about the East Washington <br />Brick Street project that Patrick Henthorn approached me on last week. Explained the <br />project to Royce and he did seem to have an interest and followed up with Patrick and <br />gave him Royce's contact information. Followed up in e-mail with Rob Nichols on the <br />Leeper Bridge in-kind COA repairs since HPC hadn't heard from INDOT. Travis Mast <br />of MOT then contacted me for that information. Followed up in e-mail with Shane <br />Fimbel about using Union Station for the Pride of Place/ Southhold Awards on May 4. <br />Responded to Linda Riley on the replacement lantern, reiterated procedure and said that <br />we would verify all specs with Steve Szaday and place the order and have it billed to her <br />address as treasurer. Prepared Staff Report for 803 W. Washington. It's a fagade <br />easement and the work requires a COA. Spoke with Joan Downs Krostenko concerning <br />739 Leland, Ramiro and Amporo Acuna—all work performed without COA or building <br />permits ---removed front windows, reduced openings installed vinyl, removed chimney <br />top above roofline and replaced with pipe. Also behind on property taxes. 801 Forest <br />has a COA and building permit for in-kind replacement of porch and deck above entry. <br />They have installed vinyl instead. Also the windows may have been changed to vinyl. <br />4 <br />