Laserfiche WebLink
quoted, may result in additional costs over and above the stated Proposal. <br />2) Buyers request for proposal did not contain specifications. Therefore all <br />material provided herein is based <br />on standard material grades and standard practices per A.I.S.C. (American <br />Institute of Steel Construction Inc.) <br />No allowance has been included for any special alloys, grades, finishes, or <br />fabrication procedures not <br />specifically stated in the bid documents. <br />3) All material provided with our standard red oxide primer, and standard SSPC- <br />SP3 preparation, no finish <br />painting included. <br />4) Please note the field measuring and surveying has been excluded. The <br />.railings will be based on the drawing <br />dimensions. We will draw railings and submit for your approval. <br />5) No warranty provided on powder coated rails. Excessive salt use, Joints and <br />scratches are susceptible to <br />rust and fading after two to three years. Scratches, marks from loading, <br />unloading and Installation are to be <br />expected. Due to the nature of the design touchup paint and annual maintenance <br />maybe required In areas that <br />the powder coating couldn't penetrate. All Vent holes required for powder coating <br />shall remain in all of the <br />products. The cost for plugging these Vent holes.is not included in the Base <br />Proposal and if required, will <br />result in an additional cost over and above the Base Proposal. We will provide <br />paint touchup to go with the <br />delivery. <br />Exclusions: <br />Erection and unloading <br />All Bituminous, Asphaltic, & finish painting <br />All masonry anchorage, rerod, inserts, and ties <br />All grouting and related material <br />Engaging an independent testing agency to perform any testing and associated <br />fees <br />Everything not specifically stated in proposal <br />