My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
February 2011
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2011
>
February 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:19 PM
Creation date
6/8/2020 10:15:03 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001362
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Voluntary Alternate #2 Lot Add - <br />Stair Guardrails to be Sandblasted, Zinc Epoxy primed and finish coat with <br />Spartan Bronze Powder Coated In <br />.lieu of our standard red oxide primer (Please refer to Qualification #6 for warranty <br />information) <br />Builders Iron <br />Works, Inc. <br />1016 E.. 12th Street — Mishawaka, IN 46544 <br />PHONE 574-254-1553 •- FAX 574.254-1598 <br />Note: Price does not include Indiana sales tax. Page 2 of 2 <br />AA material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard <br />practices. Any alteration or devlaft from <br />above spedficatlons Involving extra costs will be executed only upon written orders, and will become an extra charge over <br />and above the estimate. All agreements <br />contingent upon strikes, accidents or delays beyond our control. <br />Date Accepted <br />Works, Inc. <br />Builders Iron <br />By <br />By <br />Proposal subject to change if not accepted within 30 days. Bda' n Balenfjne bbalentine@biwsteel.com <br />If you do not receive all pages Indicated, please call Builders Iron Works, Inc. at 574-2541553 <br />File:Bartow Builders Riverview Cemetery 2-7-11 Quote <br />Qualifications: <br />1) Material as quoted per your request. It shall be the Buyers responsibility to <br />procure the necessary <br />engineering authority to analysis, engineer, and design the materials to a specific <br />safety standard, including <br />compliance with all local, and state building codes. None of our employees or <br />representatives have the . <br />authority to bind us to any speck affirmation or representation, 'or warranty other <br />than those stated herein or <br />on our forms. In particular, any technical advice we fumish with respect to the <br />use of the material is given <br />Without charge, and we shall have no obligation or liability for the advice given or <br />the results obtained, all <br />such advice being given and accepted at buyer's risk. Any deviations in material <br />sizes -or quantities, as _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.