Contractor Proposal — Additional Information <br />There are currently 36 penetrations in the roof comprised of curbs. <br />caps. vent stacks. and chimneys. While the proposal includes <br />removal of all penetrations, the UEA prefers to maintain a <br />minimum number of these penetrations in anticipation of the <br />desired reuse alternatives for the property. As you'll note in these <br />proposals, the contractor has included removal of the 3 existing <br />skylights and the clay coping tile on the North and Nest parapet <br />walls. In an attempt to minimize disruption to these historic <br />elements and obtain additional project details, the UEA <br />subsequently requested the following additional information from <br />the contractor (items are included within initial cost of proposal <br />except where noted): <br />• Existing skylights could be removed, the glass reworked as <br />needed, and replaced at a minimal cost. <br />• Existing clay coping on the west and north walls may be <br />removed, replaced. and caulked depending on the condition <br />and the termination would occur under the tile. If existing <br />tiles prove to be fragile, sheet metal noted in the proposaly <br />will be used. Foam�overspray cannot be removed from <br />existing? tile. <br />• The termination method for the east and south parapet <br />walls will include installation. of aluminum ter bar below <br />existing tile with wall anchors. Mortar joints between the <br />tiles would be caulked as needed or could be Ground and <br />re -mortared at an additional cost. <br />• Roof materials would inciude the following in order of <br />application: 71116 OSB board, EPS tapered roof insulation: <br />'. inch mechanically fastened fiber; and 15, black EPDNI <br />single -ply rubber. <br />• Lower roof area would also be addressed with same <br />materials and installation methods. <br />As you know. earlier this year the UEA proceeded , with having the <br />building and property cleared of debris and other clutter. You are <br />also aware that the UEA recently approved a budget of 5-5.000 to <br />help fund a national media campaign for the property in <br />partnership with the HPC and Historic Landmarks of Indiana. The <br />UEA anticipates that replacement of the roof would serve as an <br />excellent complement to their ongoing efforts to attract a suitable <br />use for the building and further improve the S. Nlichigan Street <br />corridor. The UEA would greatly appreciate approval of the <br />attached COA request from the HPC. <br />As a reminder. UEA Director Pam NIever and I will be attending <br />the meeting. The contractor also plans on attending. If you have <br />any questions or require additional information. please contact me <br />immediately at 235-5S47. Thank" you. <br />