Laserfiche WebLink
of the wood and architectural epoxies are needed. The entire building needs to be re- <br />painted. Painting will include removal of all paint from wood surfaces and thorough <br />scraping of the stucco elements. ADA ramp included. <br />Wood Repair <br />$10,000 <br />Exterior Painting <br />$15,000 <br />ADA Ramp <br />$10,000 <br />4) Windows and Storms <br />All of the original windows are in fully restorable condition. These windows can be made <br />more energy efficient than a replacement for comparable or less money. Complete <br />restoration includes paint and putty removal, weather-stripping, and new combination <br />wood storms <br />Window Restoration @ $650 per opening x approx. 20 openings $13,000 <br />5) HVAC, Electrical and Plumbing <br />Complete re -wiring; new plumbing and fixtures; all new heating and air conditioning <br />system. This includes an ADA bathroom. <br />HVAC, Electrical and Plumbing <br />$40,000 <br />6) Interior Finishes <br />The original plaster for the most part is in very good condition. Plaster, woodwork and <br />floor refinishing is needed. <br />Flooring <br />$8,000 <br />Woodwork <br />$6,000 <br />Plaster Renairs <br />$8.000 <br />All repairs <br />$154,000 <br />20% contineencv <br />530.800 <br />Total Rehab Costs <br />$184,800 <br />Sincerely, <br />Bob Yapp Community Preservation Specialist <br />Northern Regional Office <br />Historic Landmarks Foundation of Indiana <br />402 West Washington Street <br />South Bend, Indiana 46601 <br />574-232-4534 fax: 574-232-5549 <br />byapp@historiclandmarks.org <br />www.historidandmarks.org <br />