My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
May 2004
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2004
>
May 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:16 PM
Creation date
6/8/2020 10:11:38 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001360
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.#1099 & #1399 04500 3 <br />MASONRY RESTORATION <br />PART <br />2 PRODUCTS <br />2.1 <br />MORTAR - Conform to requirements of Section 04110. <br />2.2 <br />MASONRY UNITS <br />A. New brick shall match existing original construction brick as close <br />as possible. Submit samples showing complete range of blend of <br />color and texture. <br />2.3 <br />SEALER <br />Ka <br />A. Provide <br />one of the following building sealants / water repellents. <br />1. HULS Chem7-Treate BSM 40 by HULS America, Inc. (800) 828-0919. <br />2. SURE KLEAN - Weather Seal Silicone by Pro So Co., Inc. (913) <br />281-2700. (Protect adjacent surfaces.) <br />54 <br />2.4 <br />CLEANERS <br />A. Sure Klean #766 Limestone & Masonry Prewash and #1600 Detergent for <br />brick. <br />B. Diedrich. - #707 - Limestone Cleaner Pre -Rinse and .#202 Masonry <br />Detergent. <br />2.5 <br />RESTORERS <br />A. Limestone and Concrete <br />1. JAHN - #M70 Softstone Patching mortar for limestone. <br />2. JAHN - #M90 Patching Mortar for repair of concrete. <br />PART <br />3 EXECUTION' <br />3.1 <br />EXAMINATION <br />A. Inspect and verify that existing surfaces and building components <br />are in acceptable and ready condition to perform the work of this <br />section. <br />B. Remove any imbedded items such as hooks, nails, and anchors, which <br />may have been used previously. <br />C. Note any potential job questions or problems, then prepare agenda <br />for discussion at Pre -construction Conference. <br />or -A. <br />D. Commencement of the work means acceptance of existing conditions. <br />3.2 <br />PREPARATION <br />A. Protect elements surrounding the Work of this section from damage or <br />disfiguration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.