My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 1993
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 1993
>
November 1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 5:12:34 PM
Creation date
6/8/2020 10:08:02 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A, <br />• A. C of A's continued <br />2. 803 North Notre Dame Avenue; Firehouse #7 Local Landmark <br />Mr. Frederick read the staff report. Mr. Hayden, construction manager for <br />South Bend Heritage made a brief presentation concerning the project. The <br />major points of which were as follows: the bid by HG Roofing for a complete <br />slate replacement was approximately J that of the bid for similar work by <br />Midland Engineering and the bid by HG Roofing was still less than Midland's <br />bid for premium asphalt. Secondly, the HG Roofing bid included the complete <br />repair/replacement of the interior storm gutter system. Thirdly, the proposed <br />change to the overhead door had been withdrawn, instead the door would be <br />repaired, caulked and weather stripped as is. Mr. Hayden then detailed the <br />other aspects of the rehab which consisted of routine maintenance and landscaping. <br />Commissioner Oxian asked if the trees were included in the C of A. Mr. Hayden <br />answered using the photos of the site. Mr. Frederick read the work specs relevant <br />to landscaping. Commissioner Oxian asked about tree replacement. Mr. Hayden <br />replied that two of the trees would be replaced in-kind. Commissioner Sporleder <br />asked about the bid process. Mr. Hayden answered that both contractors bid off <br />of identical job descriptions and that each had made a site visit. Commissioner <br />Eide asked about the total square footage of the roof. Mr. Hayden replied that <br />it was 25 squares (2500 square feet). Commissioner Sporleder asked about the <br />cost of built in gutters from Midland. Mr. Hayden said the cost was approximately <br />25,000 dollars. Mr. Hayden indicated that he was checking the job references <br />of HG Roofing. Commissioner Choitz moved to approve the C of A. Commissioner <br />Sporleder seconded the motion. The motion passed unanimously. <br />IV. Regular Business <br />A. Approval of Minutes -October 18, 1993 <br />Commissioner Sporleder moved to approve the minutes as submitted. Commissioner <br />Choitz seconded the motion. The motion passed unanimously. <br />B. Treasurer's Report <br />no t. report <br />C. Correspondence <br />noT S_ report <br />D. Committee Reports <br />1. C of A staff approvals <br />A. 971-973 Riverside Drive--RD-LHD; reroofing <br />B. 1083 Riverside Drive--RD-LHD; reroofing <br />There were no questions. <br />E. Legal <br />Commissioner Oxian noted that we are awaiting word from Code Enforcement <br />concerning maintenance standards. <br />F. Historic Districts Committee <br />Commissioner Choitz announced that the HDC would meet next week. <br />G. Landmarks <br />no report <br />H. Standards and Maintenance <br />9 no report <br />I. Personel <br />Commissioner Oxian requested that the Personel Committee meet immediately <br />following this meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.