My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design and Construction Services Masonry Improvements at WWTP 1, 2, 3, and 4 - Kil Architecture & Planning
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design and Construction Services Masonry Improvements at WWTP 1, 2, 3, and 4 - Kil Architecture & Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 9:18:19 AM
Creation date
5/27/2020 9:58:26 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/26/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit L <br />• <br />1 <br />A. Once Owner approval of the Schematic Preliminary Design is gained and a directive has <br />been issued to proceed with detailed Design Development, Construction Documents and <br />Specifications (Phase 11) for the approved scope, a full service contract based upon a <br />fixed fee, percentage of the construction cost or extending this contract at an hourly rate, <br />will be negotiated. This full -service contract would include detailed architectural <br />consultation along with structural, mechanical and electrical engineering consultation for <br />a submittal to the local building department. The level of detail required for a set of <br />permit, bidding and construction documents will be determined prior to initiating this final <br />design phase. <br />III. COMPENSATION: <br />A. The Documentation (Design Phase 1) per Article LA will be developed at a fee of $1,600.00 <br />(one thousand six hundred dollars). <br />B. The Preliminary Design Services (Design Phase 1) per Article 1.13 and LC will be developed <br />at a fee of $8,500.00 (eight thousand five hundred dollars). <br />C. The Construction Documents (Design Phase 11) per Article ILA will be developed at a fee <br />range of $12,000.00 (twelve thousand dollars) to $16,000.00 (sixteen thousand dollars) <br />depending upon scope of work finalized and budgeted per Phase I Design. <br />D. The Owner will be billed at the Standard <br />2019 hourly rates as follows: <br />Principal Architect <br />$160.00/hour <br />Project Architect, Level II <br />$122.00/hour <br />Project Architect, Level I <br />$98.00/hour <br />Graduate Architect, Level III <br />$90.00/hour <br />Graduate Architect, Level II <br />$82.00/hour <br />Graduate Architect, Level I <br />$80.00/hour <br />Senior Project Designer <br />$89.00/hour <br />Project Designer <br />$83.00/hour <br />Technical CAD Designer <br />$80.00/hour <br />Intern Architect, Level III <br />$62.00/hour <br />Intern Architect, Level II <br />$56.00/hour <br />Intern Architect, Level I <br />$50.00/hour <br />Clerical Staff <br />$42.00/hour <br />These rates are subject to review and may be changed at the beginning of each calendar year. <br />VI. REIMBURSIBLES: <br />The Architect will bill reimbursable costs to the Owner without a mark-up. Reimbursable <br />expenses entail travel mileage, long distance calls, reproduction costs, photographic <br />K I L SBWWTP Galley Bldgs 1, 2, 3, 4 Proposal <br />ARCHITECTURE Kil A/P Proj# 19090 <br />PLANNING Page 3of5 <br />www.kilarchitecture.com March 19, 2020 <br />1126 LINCOLNWAY EAST SOUTH BEND IN 46601 (574) 288.2654 VOICE 289. 2420 FAX <br />
The URL can be used to link to this page
Your browser does not support the video tag.