Laserfiche WebLink
Exhibit L <br />1 <br />documentation, mailing, delivery, and handling of documents or other similar expenses incurred <br />by the Architect in the interest of the Project. <br />VILWORK SCOPE QUAILIFICATIONS: <br />Architectural and Engineering consultation services requested by the Owner beyond the <br />scope of this Contract will be billed at the Architect's hourly rates as stated above (or <br />Consultant's hourly rates). The following are additional services that may be required or <br />requested by the Owner that are not included in the Basic Scope of Services (Design <br />Phase 1) Preliminary Design: <br />a. Changes to the scope of the program as requested by the Owner after the preliminary <br />design has begun or completed as outlined under Article I.0 above, requiring additional <br />time on behalf of the Architect. <br />b. Site design is not required and not included. <br />c. Site Survey is not included and not required. <br />d. Civil engineering and site design can be provided as an additional service. <br />e. Study of an addition to the building will incur additional fees. <br />f. The preparation of 3-D computer model images of the project (interior and exterior). <br />These can be developed at an hourly rate. <br />g. Variances, easements and/or rezoning are not included, but can be provided if <br />requested by the Owner. <br />h. Detailed Architectural Design Development and Construction Document consultation <br />(Phase 11) is not included in the Phase I Preliminary Design Consultation but will be <br />provided once the exact scope of this next phase has been identified, as requested by <br />the Owner. <br />i. Civil engineering is not included in the Phase I Preliminary Design but would be part of <br />the Phase 11 Consultation along with Structural, Mechanical and Electrical engineering. <br />j. Bidding and/or Construction Administrative Phase services are not included in the <br />Phase I Preliminary Design Consultation but can be provided as part of the Phase 11 <br />Consultation. <br />k. Identification or evaluation of environmental conditions or hazardous materials is not <br />included. <br />VIII. OWNER RESPONSIBILITIES: <br />A. The Owner shall provide full information regarding requirements for the project. <br />B. The Owner shall establish and update an overall construction budget for the project <br />including reasonable contingencies. <br />IX. PAYMENTS: <br />A. Payments are due and payable 30 days from the date of the Architect's invoice. Amounts <br />unpaid 30 days after invoice date shall bear interest at a rate of 1.5 %/mo. <br />K I L SBWWTP Galley Bldgs 1, 2, 3, 4 Proposal <br />ARCHITECTURE Kil A/P Proj# 19090 <br />PLANNING Page 4of5 <br />www.kilarchitecture.com March 19, 2020 <br />1126 LINCOLNWAY EAST SOUTH BEND IN 46601 (574) 288.2654 VOICE 289. 2420 FAX <br />